Dream Castle Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2014 to Mar 2017
- Last 24 months
- 0 permits filed
9 permits since 2000: 7 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 never finaled. Typically 689 days from filing to permit and 841 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2016 | Never finaled issued Aug 2018, no final | 125 Rivoli St | horizontal & vertical addition. new addition of 1,159 sf to 1,962 existing. new deck 682 sf to replace existing 312 sf. new exit stairs of 86 sf to replace existing non compliance stairs escape ladder. add new bathroom.Details
horizontal & vertical addition. new addition of 1,159 sf to 1,962 existing. new deck 682 sf to replace existing 312 sf. new exit stairs of 86 sf to replace existing non compliance stairs escape ladder. add new bathroom. | $250,000 |
| Nov 13, 2014 | Completed final sign-off Apr 2016 | 5500 Anza St | reconfigure first floor per plan: relocate front, reconfigure interior stair per plan, enlarge existing bathroom, add a laundry room. second floor: enlarge kitchen counter per plan, convert bedroom to new master bathroom per plan. add new skylights at hall and bedroom #2. revision to pa #20140922698Details
reconfigure first floor per plan: relocate front, reconfigure interior stair per plan, enlarge existing bathroom, add a laundry room. second floor: enlarge kitchen counter per plan, convert bedroom to new master bathroom per plan. add new skylights at hall and bedroom #2. revision to pa #20140922698 | $103,000 |
| Apr 18, 2014 | Completed final sign-off Jun 2019 | 79 Midcrest Wy | vertical addition. one story addition placed on top of (e) house, dining room & living room addition at main level, new interior stair & entry/storage at grade.Details
vertical addition. one story addition placed on top of (e) house, dining room & living room addition at main level, new interior stair & entry/storage at grade. | $150,000 |