Back to kitchen remodel contractors
Dragon Werks Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2013 to Nov 2017
- Last 24 months
- 0 permits filed
26 permits since 2000: 17 completed, 9 never finaled.
Of the 9 never-finaled permits, 5 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 7 completed, 3 never finaled. Typically 0 days from filing to permit and 298 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2017 | Never finaled issued Jun 2017, no final | 631 Ofarrell St | new drywall througout apt, new cabinets in kitchen, upgrade breakers, update bathrooms, recepticles and fixtures, new shower pan and tile in bathroom, drywall work repair in kind.Details
new drywall througout apt, new cabinets in kitchen, upgrade breakers, update bathrooms, recepticles and fixtures, new shower pan and tile in bathroom, drywall work repair in kind. | $20,000 |
| Apr 11, 2016 | Completed final sign-off Feb 2019 | 75 Topaz Wy | interior remodel of a single family, condominium unit,including remodel of (e)kitchen, remodel of (e)bath, addition of a (n)bathroom and relocation of an (e)gas fireplace.Details
interior remodel of a single family, condominium unit,including remodel of (e)kitchen, remodel of (e)bath, addition of a (n)bathroom and relocation of an (e)gas fireplace. | $220,000 |
| Nov 6, 2015 | Never finaled issued Dec 2015, no final | 1138 Green St | kitchen remodel, remove wall install structural beam, bathroom remodel, plumbing, electrical, adding sink to toilet room, 2 closets to bedroomsDetails
kitchen remodel, remove wall install structural beam, bathroom remodel, plumbing, electrical, adding sink to toilet room, 2 closets to bedrooms | $100,000 |
| Oct 30, 2014 | Completed final sign-off Mar 2015 | 147 Cervantes Bl | kitchen remodel, move sink, stove, counters to new locations, new counter tops, cabinets and appliances, no walls moved, removed or added.Details
kitchen remodel, move sink, stove, counters to new locations, new counter tops, cabinets and appliances, no walls moved, removed or added. | $30,000 |
| Jul 18, 2014 | Never finaled issued Jul 2014, no final | 1006 Steiner St | replace kitchen cabinets, new countertops, replace bathroom vanity, toilet and bath tub. bathroom fan connect to (e) duct.Details
replace kitchen cabinets, new countertops, replace bathroom vanity, toilet and bath tub. bathroom fan connect to (e) duct. | $4,000 |
| Jun 6, 2014 | Completed final sign-off Jul 2015 | 442 Gold Mine Dr | remodel existing kitchen on 1st flr, new cabinets, counters, plumbing and electrity enlarge openings to courtyard and dining room, no work visible from public wayDetails
remodel existing kitchen on 1st flr, new cabinets, counters, plumbing and electrity enlarge openings to courtyard and dining room, no work visible from public way | $32,000 |
| Jun 5, 2014 | Completed final sign-off Mar 2015 | 720 05th Av | kitchen and half remodl, new cabinets and appliances, new toilet, new washer and dryer. no structuralDetails
kitchen and half remodl, new cabinets and appliances, new toilet, new washer and dryer. no structural | $9,000 |
| Apr 1, 2014 | Completed final sign-off Jul 2014 | 945 Capp St | units #1,2 & 3: to obtain final inspection for work approved under pa# 200412272172; all work is complete; remodel existing kitchen and bath(fixtures remain)Details
units #1,2 & 3: to obtain final inspection for work approved under pa# 200412272172; all work is complete; remodel existing kitchen and bath(fixtures remain) | |
| Apr 1, 2014 | Completed final sign-off Jul 2014 | 945 Capp St | unit #4: to obtain final inspection for work approved under pa# 200410086366; all work is complete (remodel existing kitchen and bathroom, fixtures in same position)Details
unit #4: to obtain final inspection for work approved under pa# 200410086366; all work is complete (remodel existing kitchen and bathroom, fixtures in same position) | |
| Mar 20, 2014 | Completed final sign-off Jun 2015 | 979 Dolores St | remodel to existing interior of unit to renovate kitchen, master bath, 2nd bath and master bedroom, relocate windows, sister new ceiling joists to existing, add 2 skylights, windows not visable from street.Details
remodel to existing interior of unit to renovate kitchen, master bath, 2nd bath and master bedroom, relocate windows, sister new ceiling joists to existing, add 2 skylights, windows not visable from street. | $100,000 |