Douglas Hamar Construction
- Based in
- Pacifica
- On San Francisco permits
- Nov 2011 to Aug 2015
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 56 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2015 | Completed final sign-off Sep 2015 | 2646 Greenwich St | revision to 201212216745, comply with 201560881. remove dryrot at front facade, parapet, base of bay window and entry. remove e stairs and replace concrete steps with handrails. rename e bedrooms at 2nd and 3rd fl as office per field inspectors requestDetails
revision to 201212216745, comply with 201560881. remove dryrot at front facade, parapet, base of bay window and entry. remove e stairs and replace concrete steps with handrails. rename e bedrooms at 2nd and 3rd fl as office per field inspectors request | $4,000 |