Back to kitchen remodel contractors
Douglas Cleaveland
- Based in
- San Francisco
- On San Francisco permits
- Jun 2012 to Aug 2026
- Last 24 months
- 5 permits filed
44 permits since 2000: 32 completed, 6 in progress, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
20 kitchen remodel permits: 17 completed, 2 in progress, 1 never finaled. Typically 0 days from filing to permit and 119 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2025 | In progress issued Jul 2025 | 251 Upland Dr | remodel existing kitchen and add 2 pocket doors. new fire placeDetails
remodel existing kitchen and add 2 pocket doors. new fire place | $32,000 |
| Sep 28, 2023 | In progress issued Dec 2023 | 3198 Pacific Av | remodel 123 sf at basement, 631 sf at 1st fl, 610 sf at 2nd fl. remodel kitchen + 3 bath + p.r.. replace in-kind 30 windows. move 2 (e) windows. remove 1 (e) window. replace (e) exterior doors & 2 windows with new french door.Details
remodel 123 sf at basement, 631 sf at 1st fl, 610 sf at 2nd fl. remodel kitchen + 3 bath + p.r.. replace in-kind 30 windows. move 2 (e) windows. remove 1 (e) window. replace (e) exterior doors & 2 windows with new french door. | $450,000 |
| Aug 3, 2023 | Never finaled issued Aug 2023, no final | 993 Filbert St | remodel, relocate (e) kitchen, bathroom, install closets, insulate exterior walls, ceiling & 5/8" typ x gypbd, install hydronic heating, capture portion of (e) garage level for new bedroom, new electrical/lighting. adding bedroom on 1st fl w/in (e) evelope @ garageDetails
remodel, relocate (e) kitchen, bathroom, install closets, insulate exterior walls, ceiling & 5/8" typ x gypbd, install hydronic heating, capture portion of (e) garage level for new bedroom, new electrical/lighting. adding bedroom on 1st fl w/in (e) evelope @ garage | $210,000 |
| Dec 5, 2022 | Completed final sign-off Sep 2023 | 991 Filbert St | interior remodel - kitchen, bathroom, 2 closets.Details
interior remodel - kitchen, bathroom, 2 closets. | $85,000 |
| May 9, 2022 | Completed final sign-off Jan 2023 | 989 Filbert St | interior residential remodel: renovate kitchen, 2 bathrooms, demolish 2 fireplaces, approx. 39 lf of non bearing non rated construction approx 37 lf of non bearing non rated wall. no increase in plmg fixture count.Details
interior residential remodel: renovate kitchen, 2 bathrooms, demolish 2 fireplaces, approx. 39 lf of non bearing non rated construction approx 37 lf of non bearing non rated wall. no increase in plmg fixture count. | $110,000 |
| Mar 18, 2022 | Completed final sign-off Jun 2022 | 991 Filbert St | exploratory demolition to all three unit's 989,991, and 993 filbert. for future kitchen and bath remodels.Details
exploratory demolition to all three unit's 989,991, and 993 filbert. for future kitchen and bath remodels. | $5,000 |
| Sep 24, 2021 | Completed final sign-off Nov 2021 | 1278 03rd Av | unit #2: kitchen remodel in kindDetails
unit #2: kitchen remodel in kind | $25,000 |
| Mar 31, 2021 | Completed final sign-off Oct 2021 | 427 Mississippi St | remodel 2 kitchens & 2 bathooms in like kind. all units, install new laundry into (e) closet. no walls altered or modified.Details
remodel 2 kitchens & 2 bathooms in like kind. all units, install new laundry into (e) closet. no walls altered or modified. | $74,000 |
| Dec 1, 2020 | Completed final sign-off Mar 2021 | 2471 15th Av | full kitchen and bathroom remodel in like kind. no structural work.Details
full kitchen and bathroom remodel in like kind. no structural work. | $60,000 |
| Dec 5, 2018 | Completed final sign-off Aug 2019 | 1001 Broadway | remodel unit 1001 1/2 entire kitchen, bath, entire unit and add bathroom. 5 new windowsDetails
remodel unit 1001 1/2 entire kitchen, bath, entire unit and add bathroom. 5 new windows | $100,000 |
| Oct 12, 2018 | Completed final sign-off Nov 2018 | 184 Parker Av | kitchen remodel. new floor, cabinets & tops. plumbing and electrical in same position. add recessed lightsDetails
kitchen remodel. new floor, cabinets & tops. plumbing and electrical in same position. add recessed lights | $10,000 |
| Dec 9, 2016 | Completed final sign-off Apr 2017 | 94 Marietta Dr | remodel (e) kitchen & bath at 2nd level, install (n) header at 2nd level.Details
remodel (e) kitchen & bath at 2nd level, install (n) header at 2nd level. | $30,000 |
| Nov 29, 2016 | Completed final sign-off Jan 2017 | 691 Rockdale Dr | kitchen remodel, new cabinets, new tops, new electric,plumbing in same location. no alteration of walls,windows, doorsDetails
kitchen remodel, new cabinets, new tops, new electric,plumbing in same location. no alteration of walls,windows, doors | $20,000 |
| Nov 30, 2015 | Completed final sign-off Feb 2016 | 1492 06th Av | replace cabinets & counter tops, new electrical in kitchen, new led lightingDetails
replace cabinets & counter tops, new electrical in kitchen, new led lighting | $6,000 |
| Nov 6, 2015 | Completed final sign-off Sep 2018 | 107 Bache St | 1. add master bedrm suite at 2/f (e) roof deck 2. remodel kitchen interior 3. add deck at 1/fDetails
1. add master bedrm suite at 2/f (e) roof deck 2. remodel kitchen interior 3. add deck at 1/f | $120,000 |
| Mar 24, 2015 | Completed final sign-off Mar 2016 | 2187 California St | remodel kitchen, update plumbing and electrical in kitchen. remodel 1/2 bath in like kind. remodel master bath.Details
remodel kitchen, update plumbing and electrical in kitchen. remodel 1/2 bath in like kind. remodel master bath. | $130,000 |
| Dec 9, 2014 | Completed final sign-off Mar 2015 | 343 Frederick St | apt #3: remodel kitchen and bathroom, change lighting, update electrical, replace water lines, replace water heater. replace entry door, replace bathroom window - no walls moved, removed or added. all fixtures layout to remain unchanged.Details
apt #3: remodel kitchen and bathroom, change lighting, update electrical, replace water lines, replace water heater. replace entry door, replace bathroom window - no walls moved, removed or added. all fixtures layout to remain unchanged. | $60,000 |
| Jan 21, 2014 | Completed final sign-off Feb 2014 | 1377 Post St | one kitchen remodel, replace cabinets, tops, dishwasher, range, all same location, two bath remodel, replace toilets, tile floors, tile shower walls, two vanities.Details
one kitchen remodel, replace cabinets, tops, dishwasher, range, all same location, two bath remodel, replace toilets, tile floors, tile shower walls, two vanities. | $37,000 |
| Jul 12, 2013 | Completed final sign-off Dec 2013 | 1847 Lyon St | kitchen remodel: cabinets, counters, elec, range, hood same locatoin. living room: remove fireplace, bathroom, replace fixtures, shower walls. lights, exhaust fan, floor heat, 3 wall lightsDetails
kitchen remodel: cabinets, counters, elec, range, hood same locatoin. living room: remove fireplace, bathroom, replace fixtures, shower walls. lights, exhaust fan, floor heat, 3 wall lights | $130,000 |
| Jun 21, 2012 | Completed final sign-off Aug 2012 | 74 Dorland St | kitchen remodel: kitchen demo, new electrical 9 circuits, new fridge water supply, move sink supply and drain 18". new gas line for range. new 5/8 fire code drywall, new insulation. led recessed lighting. led striplights under cabinets.Details
kitchen remodel: kitchen demo, new electrical 9 circuits, new fridge water supply, move sink supply and drain 18". new gas line for range. new 5/8 fire code drywall, new insulation. led recessed lighting. led striplights under cabinets. | $41,000 |