Double Woods Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2007 to Aug 2017
- Last 24 months
- 0 permits filed
35 permits since 2000: 26 completed, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 6 completed. Typically 16 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2015 | Completed final sign-off Apr 2016 | 688 Commercial St | floor 2 to 4 - interior remodel. remodel of entry stairs, main hall at manager's office, garbage room, communal kitchen, some interior doors, new paint & replace flooring, replace 8 toiletsDetails
floor 2 to 4 - interior remodel. remodel of entry stairs, main hall at manager's office, garbage room, communal kitchen, some interior doors, new paint & replace flooring, replace 8 toilets | $130,000 |
| May 8, 2015 | Completed final sign-off Sep 2015 | 1070 Capitol Av | 1st fl convert e space to bedroom, family room, full bath, add stair on back of bldgDetails
1st fl convert e space to bedroom, family room, full bath, add stair on back of bldg | $35,000 |
| Feb 17, 2015 | Completed final sign-off Apr 2016 | 866 30th Av | 1)remodel extg kitchen and add one new bath room at 2nd floor. 2)construct 2 bed room. media room, laundry area and one full bath room at ground floor. 3) construct new deck with staircase at rear of bldg(size approx 15'x 4'-0").Details
1)remodel extg kitchen and add one new bath room at 2nd floor. 2)construct 2 bed room. media room, laundry area and one full bath room at ground floor. 3) construct new deck with staircase at rear of bldg(size approx 15'x 4'-0"). | $48,000 |
| Jun 15, 2009 | Completed final sign-off Jul 2009 | 1982 23rd Av | repair front side dry rot, redo 160 sf stucco, exterior stair water proofingDetails
repair front side dry rot, redo 160 sf stucco, exterior stair water proofing | $4,000 |
| Jun 11, 2007 | Completed final sign-off Feb 2008 | 160 Westgate Dr | relocate (e) window to (n) door & (n) landing & stairs to rear yard on 1st floor. removed (e) bath, remove partition wall, add (n) bath on 2nd floor per plan.Details
relocate (e) window to (n) door & (n) landing & stairs to rear yard on 1st floor. removed (e) bath, remove partition wall, add (n) bath on 2nd floor per plan. | $10,000 |
| Mar 12, 2007 | Completed final sign-off Mar 2008 | 575 Hayes St | demolish (e) stair, guardrail, deck, toilet room & storage area. replace with (n) ada compliant bathrooms & vestibules @ ea. commercial unit. replace (e) deck with a (n) deck off ea. residential unit. walls @ property line must meet rated requirements.Details
demolish (e) stair, guardrail, deck, toilet room & storage area. replace with (n) ada compliant bathrooms & vestibules @ ea. commercial unit. replace (e) deck with a (n) deck off ea. residential unit. walls @ property line must meet rated requirements. | $50,000 |