Back to bathroom remodel contractors
Double E D Construction Inc
- Based in
- Daly City
- On San Francisco permits
- Sep 2005 to Sep 2024
- Last 24 months
- 0 permits filed
57 permits since 2000: 42 completed, 7 never finaled, 8 expired or cancelled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
22 bathroom remodel permits: 14 completed, 1 never finaled, 7 expired or cancelled. Typically 4 days from filing to permit and 127 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2024 | Completed final sign-off Nov 2024 | 1234 10th Av | convert (e) storage on the 1/f into employee changing room/bathroom.Details
convert (e) storage on the 1/f into employee changing room/bathroom. | $50,000 |
| Aug 31, 2022 | Completed final sign-off Oct 2022 | 148 Hancock St | revision to 202207229096, change wall @ new bathroomDetails
revision to 202207229096, change wall @ new bathroom | |
| Jul 28, 2022 | Completed final sign-off Oct 2022 | 1954 Funston Av | 1.remodel existing bathroom within existing building envelope and interior walls; replace tub/ shower, vanity, add toilet in kind 2. remove existing shower and install new toilet in place of shower 3. install new handwash sink in existing water closet.Details
1.remodel existing bathroom within existing building envelope and interior walls; replace tub/ shower, vanity, add toilet in kind 2. remove existing shower and install new toilet in place of shower 3. install new handwash sink in existing water closet. | $20,000 |
| Jul 22, 2022 | Completed final sign-off Oct 2022 | 148 Hancock St | ground flr unit - convert (e) storage room to new bathroom with water closet, sink/vanity and shower stall.Details
ground flr unit - convert (e) storage room to new bathroom with water closet, sink/vanity and shower stall. | $28,000 |
| Apr 8, 2021 | Completed final sign-off Nov 2023 | 1226 Page St | this proposed project is to convert the use of basement from storage/utility room into accessory dwelling unit (adu) that consists of two bedrooms, a living room, kitchen/dining area. the basement has an existing 3 fixtures bathroom, a storage room, play room, a common area for laundry/utility room.Details
this proposed project is to convert the use of basement from storage/utility room into accessory dwelling unit (adu) that consists of two bedrooms, a living room, kitchen/dining area. the basement has an existing 3 fixtures bathroom, a storage room, play room, a common area for laundry/utility room. | $60,000 |
| Nov 21, 2020 | Expired or cancelled expired Dec 2022 | 1226 Page St | 1228 unit a & b: add 1 (n) bathroom in unit a & 1 in unit (b). repair in-kind damaged dryrot studwall per plan. replace (e) window on (n) bath. relocate (e) closet. unit a add (n) stackable w/d with enclosure. install combo unit smoke/carbon monitor/detector.Details
1228 unit a & b: add 1 (n) bathroom in unit a & 1 in unit (b). repair in-kind damaged dryrot studwall per plan. replace (e) window on (n) bath. relocate (e) closet. unit a add (n) stackable w/d with enclosure. install combo unit smoke/carbon monitor/detector. | $30,000 |
| Nov 21, 2020 | Expired or cancelled expired Nov 2023 | 1230 Page St | 1230 unit a & b: add 1 bathroom in unit a & 1 in unit b. repair in-kind water damaged/dryrot studwall. replace (e) window on (n) bath. relocate closet at rear unit. alter existing stairs at top section for new configuration. install smoke/carbon detector.Details
1230 unit a & b: add 1 bathroom in unit a & 1 in unit b. repair in-kind water damaged/dryrot studwall. replace (e) window on (n) bath. relocate closet at rear unit. alter existing stairs at top section for new configuration. install smoke/carbon detector. | $27,000 |
| Oct 5, 2020 | Expired or cancelled expired Dec 2022 | 1226 Page St | 1/fl: add two bathrooms, repair work in-kind damaged studwall as per plan. replace damaged windows on sides & back of unit (single hung, double insulated vinyl)Details
1/fl: add two bathrooms, repair work in-kind damaged studwall as per plan. replace damaged windows on sides & back of unit (single hung, double insulated vinyl) | $58,000 |
| Sep 15, 2020 | Expired or cancelled expired Nov 2023 | 1230 Page St | unit a - remodel kitchen (12' x 14') and bathroom (5' x 9') in-kind.Details
unit a - remodel kitchen (12' x 14') and bathroom (5' x 9') in-kind. | $55,000 |
| Sep 15, 2020 | Expired or cancelled expired Dec 2022 | 1226 Page St | 1st fl. remodel kitchen size 12' x 14' and remodel bathroom size 5' x 9'Details
1st fl. remodel kitchen size 12' x 14' and remodel bathroom size 5' x 9' | $55,000 |
| Sep 15, 2020 | Expired or cancelled expired Nov 2023 | 1230 Page St | unit b - remodel kitchen (12' x 14') and bathroom (5' x 9') in-kind.Details
unit b - remodel kitchen (12' x 14') and bathroom (5' x 9') in-kind. | $55,000 |
| Aug 19, 2020 | Expired or cancelled expired Dec 2022 | 1226 Page St | second fl unit 1: remodel 1 bathroom & kitchen. second fl unit 2: remodel 1 bathroom & kitchen. work in kind.Details
second fl unit 1: remodel 1 bathroom & kitchen. second fl unit 2: remodel 1 bathroom & kitchen. work in kind. | $75,000 |
| Jul 9, 2020 | Completed final sign-off Mar 2021 | 1059 Capp St | main floor - relocate kitchen w/new appliances, new poder room, (e) kitchen to become guest room. convert (e) powder room to full bathroom, build 5' x 5' porch w/4 steps stairs; 2nd fl- remodel (e) bathroom w/shower, convert (e) closet to 3 fixtures bathroom, comply/correct violation #202038819.Details
main floor - relocate kitchen w/new appliances, new poder room, (e) kitchen to become guest room. convert (e) powder room to full bathroom, build 5' x 5' porch w/4 steps stairs; 2nd fl- remodel (e) bathroom w/shower, convert (e) closet to 3 fixtures bathroom, comply/correct violation #202038819. | $40,000 |
| Oct 21, 2019 | Completed final sign-off Nov 2019 | 723 29th Av | bathroom remodeling: r&r (e) tub and instlal shower stall, tiolet,s ink & faucet, shower controle, tiles on floor & walls, install 5/8in sheetrock on walls, exhaust fan, lights, 2x2ft window (max ufactor 0.32 or better), lights, gfci outlets.Details
bathroom remodeling: r&r (e) tub and instlal shower stall, tiolet,s ink & faucet, shower controle, tiles on floor & walls, install 5/8in sheetrock on walls, exhaust fan, lights, 2x2ft window (max ufactor 0.32 or better), lights, gfci outlets. | $7,000 |
| Mar 7, 2019 | Completed final sign-off Jun 2019 | 350 Broderick St | kitchen & bathroom remodel. remove and replace existing stove, sink, faucet, refrig, dishwasher and kitchen cabinets. master bathroom: remove and replace existing shower pan, shower control toilet, sink, vanity. common bathroom: remove and replace toilet, sink, vanity. kitchen area: 144 sf, mb 140Details
kitchen & bathroom remodel. remove and replace existing stove, sink, faucet, refrig, dishwasher and kitchen cabinets. master bathroom: remove and replace existing shower pan, shower control toilet, sink, vanity. common bathroom: remove and replace toilet, sink, vanity. kitchen area: 144 sf, mb 140 | $35,000 |
| Sep 19, 2018 | Completed final sign-off Jul 2019 | 61 Potomac St | basement fl/garage level- interior improvement, new family room, bedroom, and bathroom. upgrade and repair sheet rock in walls and ceiling and provide insulation. 1-h.r. f.r. property line and garage separation wall required as per planDetails
basement fl/garage level- interior improvement, new family room, bedroom, and bathroom. upgrade and repair sheet rock in walls and ceiling and provide insulation. 1-h.r. f.r. property line and garage separation wall required as per plan | $7,000 |
| Jan 16, 2018 | Completed final sign-off Jun 2018 | 1234 10th Av | revision to app#201711214474. revision scope for 3 new bathrooms.Details
revision to app#201711214474. revision scope for 3 new bathrooms. | $90,000 |
| Nov 21, 2017 | Completed final sign-off Jun 2018 | 1234 10th Av | revision to 201705176773. 3 new non accessible bathroomsDetails
revision to 201705176773. 3 new non accessible bathrooms | $45,000 |
| May 17, 2017 | Completed final sign-off Jun 2018 | 1234 10th Av | accessibility upgrades to comply with cbc 11b. renovation of office and manager's unit, 6 new non-accessible bathrooms. landscape changes.Details
accessibility upgrades to comply with cbc 11b. renovation of office and manager's unit, 6 new non-accessible bathrooms. landscape changes. | $155,000 |
| Jul 25, 2016 | Completed final sign-off Nov 2016 | 145 Stanyan St | interior remodel of both lower & upper units - remodel existing bathroom and kitchen. add bathrom at existing closet at bedroom on 2nd and 3rd floors. upgrade electrical for kitchen & bathroom, remove and replace window at living room.Details
interior remodel of both lower & upper units - remodel existing bathroom and kitchen. add bathrom at existing closet at bedroom on 2nd and 3rd floors. upgrade electrical for kitchen & bathroom, remove and replace window at living room. | $82,000 |
| May 14, 2014 | Never finaled issued May 2014, no final | 826 25th Av | 2 bathrooms + 1 kitchen remodel on each unit (#826 & # 828). remove + replace (2) toilets (2) sinks, (2) bathtubs on each unit. remvoe + replace kitchen appliances + fixtures: gas range, sink, dishwasher, garbage disposer + refigerator.Details
2 bathrooms + 1 kitchen remodel on each unit (#826 & # 828). remove + replace (2) toilets (2) sinks, (2) bathtubs on each unit. remvoe + replace kitchen appliances + fixtures: gas range, sink, dishwasher, garbage disposer + refigerator. | $15,000 |
| Oct 9, 2013 | Completed final sign-off Aug 2016 | 223 Joost Av | comply with complaint #201324531. repair fire damagewd in-kind/restoration for electrical work, rework bathrooms, kitchen, new sheetrock, replace damaged windows, door and 24" x 24" new skylight in hallway per plan.Details
comply with complaint #201324531. repair fire damagewd in-kind/restoration for electrical work, rework bathrooms, kitchen, new sheetrock, replace damaged windows, door and 24" x 24" new skylight in hallway per plan. | $60,000 |