Back to bathroom remodel contractors
Don Bauer & Co
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Aug 2021
- Last 24 months
- 0 permits filed
15 permits since 2000: 8 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 5 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 117 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 21, 2020 | Completed final sign-off Jun 2022 | 545 Hugo St | g/f: interior remodel: replace kitchen, new bathroom, wall board new type x 2x layer at common walls, replace window glazing with thermopane, new finishes.Details
g/f: interior remodel: replace kitchen, new bathroom, wall board new type x 2x layer at common walls, replace window glazing with thermopane, new finishes. | $20,000 |
| Oct 13, 2010 | Completed final sign-off Dec 2010 | 1254 07th Av | kitchen & bathroom remodel of studio apartment, bathroom, new drywall, tub, toilet, sink and tile. kitchen, new drywall, cabinets, counter tops sink, appliances, flooring, provide high efficacy lights/occupancy sensor per cec 150(k)Details
kitchen & bathroom remodel of studio apartment, bathroom, new drywall, tub, toilet, sink and tile. kitchen, new drywall, cabinets, counter tops sink, appliances, flooring, provide high efficacy lights/occupancy sensor per cec 150(k) | $9,000 |
| Sep 13, 2007 | Completed final sign-off Oct 2007 | 543 Hugo St | work @ unit# 543 only. remodel kitchen & bathroom. sink & counter. bath new lavatory.Details
work @ unit# 543 only. remodel kitchen & bathroom. sink & counter. bath new lavatory. | $2,000 |
| Sep 1, 2006 | Completed final sign-off Feb 2007 | 2679 23rd Av | bathroom remodel-install new vanity, sink, (e) water closet, bath tub w/shower, tile floor & tub surround. no changes to partitions or windows.Details
bathroom remodel-install new vanity, sink, (e) water closet, bath tub w/shower, tile floor & tub surround. no changes to partitions or windows. | $10,000 |