Don Bauer & Co
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Aug 2021
- Last 24 months
- 0 permits filed
15 permits since 2000: 8 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 5 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2021 | Expired or cancelled expired Feb 2023 | 747 42nd Av | replace 2 windows in the back of the building to comply with complaint 202179188. replace 6 windows in the front of the building. diesng and material of windows will be kept the same. windows at front to be wood clad or architectual grade aluminum casements no slidersDetails
replace 2 windows in the back of the building to comply with complaint 202179188. replace 6 windows in the front of the building. diesng and material of windows will be kept the same. windows at front to be wood clad or architectual grade aluminum casements no sliders | $8,000 |
| Oct 21, 2020 | Completed final sign-off Jun 2022 | 545 Hugo St | g/f: interior remodel: replace kitchen, new bathroom, wall board new type x 2x layer at common walls, replace window glazing with thermopane, new finishes.Details
g/f: interior remodel: replace kitchen, new bathroom, wall board new type x 2x layer at common walls, replace window glazing with thermopane, new finishes. | $20,000 |
| Feb 26, 2020 | Never finaled issued Jul 2020, no final | 752 Elizabeth St | new rear 5' max height site retaining wallsDetails
new rear 5' max height site retaining walls | $10,000 |
| May 14, 2019 | Never finaled issued Aug 2019, no final | 752 Elizabeth St | temporary earth shoring system to accomodate foundation constructoin for pa 2015-0717-1767. shoring consists of soldier piles/beams & pressure heated lagging with internal bracingDetails
temporary earth shoring system to accomodate foundation constructoin for pa 2015-0717-1767. shoring consists of soldier piles/beams & pressure heated lagging with internal bracing | $200,000 |
| Jun 28, 2018 | Completed final sign-off Jul 2018 | 535 Hugo St | seismic work. voluntary bolt and brace anchor perimeter with simpson plates or 5/8" bolts which ever is appropriate 4' on center. strap posts where needed. attach a35 brackets joists to studs and mudsills.Details
seismic work. voluntary bolt and brace anchor perimeter with simpson plates or 5/8" bolts which ever is appropriate 4' on center. strap posts where needed. attach a35 brackets joists to studs and mudsills. | $6,000 |
| May 24, 2018 | Never finaled issued Jan 2019, no final | 580 Elizabeth St | temp earth shoring system to accommodate excavation for foundation at 578 elizabeth st. consisting of shotecrete tiebacks & underpinning.Details
temp earth shoring system to accommodate excavation for foundation at 578 elizabeth st. consisting of shotecrete tiebacks & underpinning. | $50,000 |
| Jan 10, 2018 | Never finaled issued Dec 2019, no final | 2708 California St | to erect 4 stories, no basement, type v-a, 2 units residential building. ** maher: disturbance of at least 50 cu.yd. of soil. route to dph **Details
to erect 4 stories, no basement, type v-a, 2 units residential building. ** maher: disturbance of at least 50 cu.yd. of soil. route to dph ** | $2,000,000 |
| Jan 10, 2018 | Never finaled issued Dec 2019, no final | 2704 California St | to erect 4 stories, no basement, type v-a, 2 units residential building. ** maher: disturbance of at least 50 cu.yd. of soil. route to dph **Details
to erect 4 stories, no basement, type v-a, 2 units residential building. ** maher: disturbance of at least 50 cu.yd. of soil. route to dph ** | $2,000,000 |
| Jun 28, 2012 | Completed final sign-off Jul 2012 | 76 Laidley St | revision to 201009211298. pre-approved elevator to be installed under separate permit. 3 story residential elevatorDetails
revision to 201009211298. pre-approved elevator to be installed under separate permit. 3 story residential elevator | |
| Apr 25, 2011 | Completed final sign-off May 2011 | 53 Wilder St | leak repair from overflow. repair gyp bd ceiling. area=100 sf. with 5/8 gy[ bd sype x in kind with insulation. no structuralDetails
leak repair from overflow. repair gyp bd ceiling. area=100 sf. with 5/8 gy[ bd sype x in kind with insulation. no structural | $1,000 |
| Oct 13, 2010 | Completed final sign-off Dec 2010 | 1254 07th Av | kitchen & bathroom remodel of studio apartment, bathroom, new drywall, tub, toilet, sink and tile. kitchen, new drywall, cabinets, counter tops sink, appliances, flooring, provide high efficacy lights/occupancy sensor per cec 150(k)Details
kitchen & bathroom remodel of studio apartment, bathroom, new drywall, tub, toilet, sink and tile. kitchen, new drywall, cabinets, counter tops sink, appliances, flooring, provide high efficacy lights/occupancy sensor per cec 150(k) | $9,000 |
| Sep 13, 2007 | Completed final sign-off Oct 2007 | 543 Hugo St | work @ unit# 543 only. remodel kitchen & bathroom. sink & counter. bath new lavatory.Details
work @ unit# 543 only. remodel kitchen & bathroom. sink & counter. bath new lavatory. | $2,000 |
| Oct 6, 2006 | Never finaled issued Oct 2006, no final | 2815 Diamond St | erect non electric projecting double faced replacement sign.Details
erect non electric projecting double faced replacement sign. | |
| Sep 1, 2006 | Completed final sign-off Feb 2007 | 2679 23rd Av | bathroom remodel-install new vanity, sink, (e) water closet, bath tub w/shower, tile floor & tub surround. no changes to partitions or windows.Details
bathroom remodel-install new vanity, sink, (e) water closet, bath tub w/shower, tile floor & tub surround. no changes to partitions or windows. | $10,000 |
| Jan 18, 2000 | Completed final sign-off Mar 2000 | 535 Hugo St | replace 1 window plus trim & siding, replace in kindDetails
replace 1 window plus trim & siding, replace in kind | $2,500 |