Domicile Construction
- Based in
- Novato
- On San Francisco permits
- Mar 2001 to Oct 2018
- Last 24 months
- 0 permits filed
30 permits since 2000: 27 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 4 completed, 1 never finaled. Typically 258 days from filing to permit and 440 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2016 | Completed final sign-off Feb 2020 | 392 San Jose Av | raise (e) sloped roof over rear 1 - story extension, appx. 5 ft. remodel (e) kitchen, replace dryrot at area of remodel. replace (e)deteriorate deck @ gradeDetails
raise (e) sloped roof over rear 1 - story extension, appx. 5 ft. remodel (e) kitchen, replace dryrot at area of remodel. replace (e)deteriorate deck @ grade | $110,000 |
| Mar 30, 2015 | Completed final sign-off Apr 2015 | 347 Joost Av | repair awning damage on (e) rear deck. in-like-kind. 50% threshold of structure.Details
repair awning damage on (e) rear deck. in-like-kind. 50% threshold of structure. | $10,500 |
| Feb 21, 2014 | Completed final sign-off Feb 2017 | 116 Moffitt St | 3rd story addition consist of: stairway to new mstr bedrm, deck&bath, 2 other bedrooms&a bath.new rear yard deck at(e) 2nd floor. interior alterations to (e) 2nd flr including alterations to living & dining area & (e) bathroom.Details
3rd story addition consist of: stairway to new mstr bedrm, deck&bath, 2 other bedrooms&a bath.new rear yard deck at(e) 2nd floor. interior alterations to (e) 2nd flr including alterations to living & dining area & (e) bathroom. | $350,000 |
| Aug 21, 2008 | Never finaled issued Aug 2008, no final | 2779 San Bruno Av | repair rear deck existing. replace decking board sister strenger to lower landings.Details
repair rear deck existing. replace decking board sister strenger to lower landings. | $5,500 |
| Aug 17, 2006 | Completed final sign-off May 2008 | 15 Cityview Wy | add family room and deck at main level and master bedroom suite at new upper floor.Details
add family room and deck at main level and master bedroom suite at new upper floor. | $60,000 |