Back to bathroom remodel contractors
Domicile Construction
- Based in
- Novato
- On San Francisco permits
- Mar 2001 to Oct 2018
- Last 24 months
- 0 permits filed
30 permits since 2000: 27 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 0 days from filing to permit and 146 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2015 | Completed final sign-off Jul 2016 | 2655 15th Av | remodel existing kitchen and bathroom. a like.Details
remodel existing kitchen and bathroom. a like. | $35,000 |
| Jan 26, 2015 | Completed final sign-off May 2015 | 129 Moffitt St | remodel existing bathroom no change in layout. (no walls to be relocated) bathroom remodel shall comply with lighting per cec105.0(k)5Details
remodel existing bathroom no change in layout. (no walls to be relocated) bathroom remodel shall comply with lighting per cec105.0(k)5 | $22,500 |
| Feb 21, 2014 | Completed final sign-off Feb 2017 | 116 Moffitt St | 3rd story addition consist of: stairway to new mstr bedrm, deck&bath, 2 other bedrooms&a bath.new rear yard deck at(e) 2nd floor. interior alterations to (e) 2nd flr including alterations to living & dining area & (e) bathroom.Details
3rd story addition consist of: stairway to new mstr bedrm, deck&bath, 2 other bedrooms&a bath.new rear yard deck at(e) 2nd floor. interior alterations to (e) 2nd flr including alterations to living & dining area & (e) bathroom. | $350,000 |
| Aug 16, 2012 | Completed final sign-off Aug 2012 | 449 Melrose Av | change (e) cabinets, countertops in kitchen, upgrade bathroom tilesDetails
change (e) cabinets, countertops in kitchen, upgrade bathroom tiles | $9,000 |
| Jul 10, 2012 | Completed final sign-off Dec 2012 | 11 Cityview Wy | remodel existing bathroom (like) repl of toilet, vanity and delit shower and pocket door (no structural wall no lighting)Details
remodel existing bathroom (like) repl of toilet, vanity and delit shower and pocket door (no structural wall no lighting) | $12,000 |
| Aug 12, 2010 | Completed final sign-off Oct 2010 | 125 Moffitt St | construct new master bathroom at ground floor in rear portion of garage. convert existing guest room to new master bedroom suite as a legally habitable conditioned space at ground floor.Details
construct new master bathroom at ground floor in rear portion of garage. convert existing guest room to new master bedroom suite as a legally habitable conditioned space at ground floor. | $8,750 |
| May 26, 2006 | Completed final sign-off Jan 2007 | 15 Cityview Wy | remodel existing kitchen & bathroom. no change to partitions or windows.Details
remodel existing kitchen & bathroom. no change to partitions or windows. | $44,000 |