Back to kitchen remodel contractors
Dollard Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2002 to Aug 2026
- Last 24 months
- 10 permits filed
149 permits since 2000: 101 completed, 6 in progress, 20 never finaled, 22 expired or cancelled.
Of the 20 never-finaled permits, 3 are 3 to 5 years old, 5 are 5 to 10 years old, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
45 kitchen remodel permits: 26 completed, 5 in progress, 2 never finaled, 12 expired or cancelled. Typically 0 days from filing to permit and 310 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 26, 2026 | In progress issued Aug 2026 | 1677 Sacramento St | #5 & 11: upgrade 2 bathroom & 2 kitchen cabinets & fixtures. upgrade tile. upgrade electrical as needed. demo wall finishes as needed. no wall stud construction or demolition, no change in plumbing fixture count, no other work proposed or authorized.Details
#5 & 11: upgrade 2 bathroom & 2 kitchen cabinets & fixtures. upgrade tile. upgrade electrical as needed. demo wall finishes as needed. no wall stud construction or demolition, no change in plumbing fixture count, no other work proposed or authorized. | $50,000 |
| Aug 26, 2026 | In progress issued Aug 2026 | 1677 Sacramento St | #4 & 14: upgrade bathroom & kitchen cabinets & fixtures. upgrade tile. upgrade electrical as needed. demo wall finishes as needed. no wall stud construction or demolition, no change in plumbing fixture count, no other work proposed or authorized.Details
#4 & 14: upgrade bathroom & kitchen cabinets & fixtures. upgrade tile. upgrade electrical as needed. demo wall finishes as needed. no wall stud construction or demolition, no change in plumbing fixture count, no other work proposed or authorized. | $50,000 |
| Aug 26, 2026 | In progress issued Aug 2026 | 1677 Sacramento St | #6 & 18: upgrade 2 bathroom & 2 kitchen cabinets & fixtures. upgrade tile. upgrade electrical as needed. demo wall finishes as needed. no wall stud construction or demolition, no change in plumbing fixture count, no other work proposed or authorized.Details
#6 & 18: upgrade 2 bathroom & 2 kitchen cabinets & fixtures. upgrade tile. upgrade electrical as needed. demo wall finishes as needed. no wall stud construction or demolition, no change in plumbing fixture count, no other work proposed or authorized. | $50,000 |
| Jun 3, 2026 | In progress issued Jun 2026 | 2820 Scott St | address a leak at the rear of the property pm deck outside of kitchen. remove stucco as needed. remove flooring for new waterproofing. in kind repair. all work is in back of property not street facing.Details
address a leak at the rear of the property pm deck outside of kitchen. remove stucco as needed. remove flooring for new waterproofing. in kind repair. all work is in back of property not street facing. | $60,000 |
| Oct 17, 2025 | In progress issued Dec 2025 | 225 Locust St | interior remodel including new mud room at basement, remodel (e) kitchen and pantry on 1st flr, remodel (e) primary suite and new laundry at 2nd flr, new dubwaiter connecting basement, 1st, and 2nd flrs, modified window opening at rear of (e) 2nd flr.Details
interior remodel including new mud room at basement, remodel (e) kitchen and pantry on 1st flr, remodel (e) primary suite and new laundry at 2nd flr, new dubwaiter connecting basement, 1st, and 2nd flrs, modified window opening at rear of (e) 2nd flr. | $500,000 |
| Feb 6, 2024 | Completed final sign-off Mar 2025 | 3363 Washington St | revision to pa# 202205164340 lvl 1- floor framing alteration of au pair room 103 & au pair bath 104. lvl 2- floor framing alteration to accommodate kitchen revision- 206 layout, lvl 3- floor framing alteration to accommodate revision primary bath 1- 306,Details
revision to pa# 202205164340 lvl 1- floor framing alteration of au pair room 103 & au pair bath 104. lvl 2- floor framing alteration to accommodate kitchen revision- 206 layout, lvl 3- floor framing alteration to accommodate revision primary bath 1- 306, | $29,000 |
| May 11, 2023 | Completed final sign-off Oct 2023 | 1743 Golden Gate Av | remodel unit#2: replace kitchen cabinets and appliances. upgrade bath fixtures and tile. upgrade plumbing and electrical throughout. also to comply with nov# 202299803.Details
remodel unit#2: replace kitchen cabinets and appliances. upgrade bath fixtures and tile. upgrade plumbing and electrical throughout. also to comply with nov# 202299803. | $30,000 |
| Dec 21, 2022 | Expired or cancelled withdrawn May 2023 | 1743 Golden Gate Av | unit 2-2/f only: interior remodel, reconfigure (1)bath & (1)kitchen, remove/reconf partitions/closets, replace bath window in-kind w/tempered window, cover interior side of window @ kitchen. no strcutural work. to comply with pid nov#202299803 dated 12/15/2022Details
unit 2-2/f only: interior remodel, reconfigure (1)bath & (1)kitchen, remove/reconf partitions/closets, replace bath window in-kind w/tempered window, cover interior side of window @ kitchen. no strcutural work. to comply with pid nov#202299803 dated 12/15/2022 | $50,000 |
| Dec 28, 2021 | Completed final sign-off Aug 2022 | 4049 26th St | no work to ground and 2nd level. remodel (e) baths @ 3rd level, reconfigure kitchen/ dining/ laundry to create space for 2 home office rooms, reconfigure windows and door @ lightwell and rear of top story only. no work @ front facade.Details
no work to ground and 2nd level. remodel (e) baths @ 3rd level, reconfigure kitchen/ dining/ laundry to create space for 2 home office rooms, reconfigure windows and door @ lightwell and rear of top story only. no work @ front facade. | $50,000 |
| Jul 23, 2021 | Completed final sign-off May 2023 | 1743 Golden Gate Av | revison to pa# 2016-0715-2530, adjust kitchen location, remove window in office (not for sleeping) relocate laundry and relocate trash recycle compostDetails
revison to pa# 2016-0715-2530, adjust kitchen location, remove window in office (not for sleeping) relocate laundry and relocate trash recycle compost | |
| Apr 29, 2021 | Expired or cancelled expired May 2023 | 1743 Golden Gate Av | kitchen remodel: upgrade cabinetry, upgrade gas, upgrade electrical.Details
kitchen remodel: upgrade cabinetry, upgrade gas, upgrade electrical. | $20,000 |
| Feb 3, 2021 | Expired or cancelled cancelled Nov 2022 | 3569 Washington St | demo & upgrade 1 kitchen & (6) existing bathrooms, upgrade electrica & plumbing throughout and add interior insulation. no walls movedDetails
demo & upgrade 1 kitchen & (6) existing bathrooms, upgrade electrica & plumbing throughout and add interior insulation. no walls moved | $100,000 |
| Aug 21, 2020 | Expired or cancelled expired May 2023 | 1743 Golden Gate Av | #9: revision to pa#202003046123. scope: bath & kitchen reconfiguration at unit 9 only. reconfigure some partitions - no structural work. replace one window in kind at (e) bath.Details
#9: revision to pa#202003046123. scope: bath & kitchen reconfiguration at unit 9 only. reconfigure some partitions - no structural work. replace one window in kind at (e) bath. | $10,000 |
| Mar 4, 2020 | Expired or cancelled expired May 2023 | 1743 Golden Gate Av | apt #9: kitchen and bath remodel, upgrade electrical, upgrade plumbing, change 4 windows, not visible from street in kindDetails
apt #9: kitchen and bath remodel, upgrade electrical, upgrade plumbing, change 4 windows, not visible from street in kind | $25,000 |
| Apr 27, 2018 | Completed final sign-off Jan 2019 | 2711 Pine St | kitchen remodel - change cabinetry, counter tops, appliances. no change to walls/doors/openings.Details
kitchen remodel - change cabinetry, counter tops, appliances. no change to walls/doors/openings. | $20,000 |
| Jun 6, 2017 | Completed final sign-off Mar 2026 | 241 Frederick St | fill in e lightwell on all floors. kitchen remodel on 2nd flm, master bedroom 3rd flDetails
fill in e lightwell on all floors. kitchen remodel on 2nd flm, master bedroom 3rd fl | $40,000 |
| Nov 3, 2016 | Never finaled issued Nov 2016, no final | 1743 Golden Gate Av | unit #11 only - replace kitchen cabinets, replace fixtures in bathroom. upgrade gas line, change three windows not visible from the street. reference to complaint #201583082.Details
unit #11 only - replace kitchen cabinets, replace fixtures in bathroom. upgrade gas line, change three windows not visible from the street. reference to complaint #201583082. | $25,000 |
| Jul 7, 2016 | Completed final sign-off Feb 2021 | 348 Waller St | front bldg. add unit per ord 30-15. add 2 units: 1 one-bedroom unit & 1 studio unit. 1 kitchen & 1 bathroom for each unit.Details
front bldg. add unit per ord 30-15. add 2 units: 1 one-bedroom unit & 1 studio unit. 1 kitchen & 1 bathroom for each unit. | $170,000 |
| May 14, 2015 | Completed final sign-off Nov 2018 | 1274 Filbert St | interior remodel within (e) building included limited structural work, kitchen remodel, bathroom, reconfigure bed/study and closet spacesDetails
interior remodel within (e) building included limited structural work, kitchen remodel, bathroom, reconfigure bed/study and closet spaces | $50,000 |
| Dec 17, 2014 | Completed final sign-off Oct 2015 | 999 Green St | renovate (e) 1 bedroom codominum unit on 12th floor of a 32 story residential tower. remodel (e) kitchen, (n) fixture, appliances & cabinetry. remodel (e) bathroom. removal of non-load bearing partitions at living room and bedroom.Details
renovate (e) 1 bedroom codominum unit on 12th floor of a 32 story residential tower. remodel (e) kitchen, (n) fixture, appliances & cabinetry. remodel (e) bathroom. removal of non-load bearing partitions at living room and bedroom. | $60,000 |
| Nov 13, 2014 | Expired or cancelled expired Jan 2017 | 1743 Golden Gate Av | remodel kitchen and bathroom. change cabinets and fixtures upgrade plmg and electrical. work unit #6 only.Details
remodel kitchen and bathroom. change cabinets and fixtures upgrade plmg and electrical. work unit #6 only. | $25,000 |
| Aug 21, 2014 | Completed final sign-off Jul 2015 | 352 Waller St | unit legalization ordinance 43-14 at rear building (legal sfd), legalize 2nd unit #352a waller street, install new bathroom to existing bathroom & legalize existing kitchen that was added without permit. no change of use or work to be done in the front legal 3 unit apartment bldg.(detached bldg inDetails
unit legalization ordinance 43-14 at rear building (legal sfd), legalize 2nd unit #352a waller street, install new bathroom to existing bathroom & legalize existing kitchen that was added without permit. no change of use or work to be done in the front legal 3 unit apartment bldg.(detached bldg in | $17,000 |
| Mar 20, 2014 | Completed final sign-off Feb 2015 | 1743 Golden Gate Av | remodel kitchen & bathroom in unit #3 & #5, replace cabinets & plumbing fixtures. update electrical throughout. replace 4 wood windows in side, lightwell w/like kind. unit #3 bath 5x8', kitchen 8'x9'. unit #5 bath 5'x8', kitchen 8'x12'. ordiance no. 155-13 not required.Details
remodel kitchen & bathroom in unit #3 & #5, replace cabinets & plumbing fixtures. update electrical throughout. replace 4 wood windows in side, lightwell w/like kind. unit #3 bath 5x8', kitchen 8'x9'. unit #5 bath 5'x8', kitchen 8'x12'. ordiance no. 155-13 not required. | $30,000 |
| May 9, 2013 | Completed final sign-off Dec 2013 | 1760 Golden Gate Av | remodel unit #7. remodel kitchen, replace bathroom toilet and sink, removal of (e) non-load bearing walls and construction of new walls to covert studio aptment into a one bedroom apartment. replace kitchen window @ (e) lightwell (e) header to remain. de electrical and plumbing.Details
remodel unit #7. remodel kitchen, replace bathroom toilet and sink, removal of (e) non-load bearing walls and construction of new walls to covert studio aptment into a one bedroom apartment. replace kitchen window @ (e) lightwell (e) header to remain. de electrical and plumbing. | $18,000 |
| Jul 6, 2011 | Expired or cancelled expired Jan 2016 | 338 Carl St | kitchen remodel: replace cabinets & appliances.Details
kitchen remodel: replace cabinets & appliances. | $20,000 |
| Jan 28, 2011 | Completed final sign-off Feb 2011 | 660 Darien Wy | revise application # 201004261053. there will be no work done to the kitchen area.Details
revise application # 201004261053. there will be no work done to the kitchen area. | |
| Aug 17, 2010 | Completed final sign-off Feb 2011 | 1444 Jefferson St | revision to app#201006235119. install 2 new beams in garage. install new post and beam in lower unit foyer. install new header in kitchen area.Details
revision to app#201006235119. install 2 new beams in garage. install new post and beam in lower unit foyer. install new header in kitchen area. | $2,500 |
| Apr 26, 2010 | Completed final sign-off Feb 2011 | 660 Darien Wy | remodel kitchen. replace cabinets and appliances. remodel lower bath change tile and fixtures.Details
remodel kitchen. replace cabinets and appliances. remodel lower bath change tile and fixtures. | $25,000 |
| Aug 25, 2008 | Completed final sign-off Aug 2009 | 3030 Pierce St | work @ lower unit only. change fixtures in bathroom, new tile in bathroom, upgrade / change electrical outlets, add recess lighting, change kitchen counter top.Details
work @ lower unit only. change fixtures in bathroom, new tile in bathroom, upgrade / change electrical outlets, add recess lighting, change kitchen counter top. | $30,000 |
| Jun 19, 2007 | Completed final sign-off Oct 2007 | 1 Hill Point Av | install new kitchen cabinets, install new appliances in kitchen cabinets, install new appliances in kitchen, install new cabients in pantry. not move walls, doors or windows.Details
install new kitchen cabinets, install new appliances in kitchen cabinets, install new appliances in kitchen, install new cabients in pantry. not move walls, doors or windows. | $18,000 |
| Nov 22, 2006 | Expired or cancelled cancelled May 2007 | 415 Carl St | remodel kitchen& bathrooms,upgrade plumbing&electrical throughout.replace ceiling w/ 5/8 sheetrock.replace lath&plaster at kitchen&baths walls.less than 2/3 # of stories involved in substential chg if removal is exceeded seismic upgrade w/ plans will be req.no structural.Details
remodel kitchen& bathrooms,upgrade plumbing&electrical throughout.replace ceiling w/ 5/8 sheetrock.replace lath&plaster at kitchen&baths walls.less than 2/3 # of stories involved in substential chg if removal is exceeded seismic upgrade w/ plans will be req.no structural. | $120,000 |
| Nov 22, 2006 | Expired or cancelled cancelled May 2007 | 415 Carl St | remodel 2 kitchens& 2 bathrooms,upgrade plumbing&electrical throughout.replace ceiling w/ 5/8 sheetrock.replace lath&plaster at kitchen&baths walls.less than 2/3 # of stories involved in substantial chg. if removal is exceeded seismic upgrade, w/ plans will be req.non-structural.Details
remodel 2 kitchens& 2 bathrooms,upgrade plumbing&electrical throughout.replace ceiling w/ 5/8 sheetrock.replace lath&plaster at kitchen&baths walls.less than 2/3 # of stories involved in substantial chg. if removal is exceeded seismic upgrade, w/ plans will be req.non-structural. | $120,000 |
| Nov 22, 2006 | Expired or cancelled cancelled May 2007 | 415 Carl St | remodel 3 kitchen& 3 bathrooms,upgrade plumbing&electrical throughout.replace ceiling w/ 5/8 sheetrock.replace lath&plaster at kitchen&baths walls.less than 2/3 # of stories involved in substential chg if removal is exceeded seismic upgrade w/ plans will be req.no structural.Details
remodel 3 kitchen& 3 bathrooms,upgrade plumbing&electrical throughout.replace ceiling w/ 5/8 sheetrock.replace lath&plaster at kitchen&baths walls.less than 2/3 # of stories involved in substential chg if removal is exceeded seismic upgrade w/ plans will be req.no structural. | $180,000 |
| Oct 27, 2006 | Completed final sign-off Apr 2007 | 376 Arguello Bl | kitchen remodel including removal ofnon bearing walls, remodel of existing laundry and closet space to add a master bathDetails
kitchen remodel including removal ofnon bearing walls, remodel of existing laundry and closet space to add a master bath | $50,000 |
| Oct 11, 2006 | Completed final sign-off Nov 2007 | 415 Carl St | interior remodeling: replace (e) kitchen cabs & finishes with new, remodel 2 kitchens, remodel (e) bathrooms, remodel 2 baths. replace (e) interior finishes & trims with new. non structural.Details
interior remodeling: replace (e) kitchen cabs & finishes with new, remodel 2 kitchens, remodel (e) bathrooms, remodel 2 baths. replace (e) interior finishes & trims with new. non structural. | $85,000 |
| Oct 11, 2006 | Completed final sign-off Nov 2007 | 415 Carl St | interior remodeling: replace existing kitchen cabs & finishes with new 3 kitchens, remodel existing bathrooms 3 bath, replace (e) interior finishes & trims with new.Details
interior remodeling: replace existing kitchen cabs & finishes with new 3 kitchens, remodel existing bathrooms 3 bath, replace (e) interior finishes & trims with new. | $125,000 |
| Apr 18, 2006 | Completed final sign-off Mar 2007 | 2989 Lake St | rev. appl#200603237334 (no drawing) install new 7'x10' door in family room, 3 new windows in kitchen, take out existin gwindows in family room. move kitchen to new location. remodel 3 bathrooms & 1 powder room. move walls as per structural plan. structural upgrade as per plan. take out sink in bar.Details
rev. appl#200603237334 (no drawing) install new 7'x10' door in family room, 3 new windows in kitchen, take out existin gwindows in family room. move kitchen to new location. remodel 3 bathrooms & 1 powder room. move walls as per structural plan. structural upgrade as per plan. take out sink in bar. | $60,000 |
| Mar 23, 2006 | Completed final sign-off Mar 2007 | 2989 Lake St | demo kitchen two bathrooms, + one powder room. electrical + plumbing upgrade throughout house. install 5/8 sheetrock. install new appliances, fixtures + cabinetry in (e) locations. kitchen & powder or second floor. 2 bathrooms on 3rd flr. no structural changes.Details
demo kitchen two bathrooms, + one powder room. electrical + plumbing upgrade throughout house. install 5/8 sheetrock. install new appliances, fixtures + cabinetry in (e) locations. kitchen & powder or second floor. 2 bathrooms on 3rd flr. no structural changes. | $200,000 |
| Sep 16, 2005 | Expired or cancelled expired Oct 2006 | 112 Arguello Bl | remodel six kitchens & six bathrooms. demo all kitchens & bathrms back to the studs. install new pDetails
remodel six kitchens & six bathrooms. demo all kitchens & bathrms back to the studs. install new p | $150,000 |
| Aug 5, 2005 | Never finaled issued Aug 2005, no final | 340 Carl St | non structural interior remodeling.remodel (e) kitchen, replace (e) cabinet finishes w/new .remodelDetails
non structural interior remodeling.remodel (e) kitchen, replace (e) cabinet finishes w/new .remodel | $25,000 |
| May 31, 2005 | Completed final sign-off Oct 2005 | 1341 Lake St | demo 4 kitchens, upgrade plumbing & electrical sheetrock with 5/8" firerated.Details
demo 4 kitchens, upgrade plumbing & electrical sheetrock with 5/8" firerated. | $65,000 |
| Jan 13, 2005 | Completed final sign-off May 2005 | 80 San Pablo Av | remodel kitchen-upgrad electrical plumbing. insulate as needed. sheetrock with 5/8 type x. hange newDetails
remodel kitchen-upgrad electrical plumbing. insulate as needed. sheetrock with 5/8 type x. hange new | $15,000 |
| May 26, 2004 | Completed final sign-off Apr 2006 | 46 Divisadero St | remodel kitchen,add bay window,remodel 3 bathrooms,relocate powder room,remodel closets,replace (e)Details
remodel kitchen,add bay window,remodel 3 bathrooms,relocate powder room,remodel closets,replace (e) | $150,000 |
| May 24, 2004 | Completed final sign-off Jul 2006 | 2258 Jackson St | remove one dwg unit and merge into owner's (e) unit remodel garage remodel kitchen and one bath inDetails
remove one dwg unit and merge into owner's (e) unit remodel garage remodel kitchen and one bath in | $95,000 |
| Mar 4, 2004 | Expired or cancelled expired Jan 2007 | 90 San Pablo Av | remodel kitchen/bath,install new cabinets & new appliances,install new toilet/sink in g/fDetails
remodel kitchen/bath,install new cabinets & new appliances,install new toilet/sink in g/f | $20,000 |