Back to bathroom remodel contractors
Dohrmann Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2002 to Oct 2025
- Last 24 months
- 1 permit filed
32 permits since 2000: 28 completed, 4 never finaled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 11 completed. Typically 0 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 14, 2025 | Completed final sign-off Nov 2025 | 947 Lake St | bathroom remodel. replacing surfae finishes only. medicine cabinet, toilet, sink at existing locations only.Details
bathroom remodel. replacing surfae finishes only. medicine cabinet, toilet, sink at existing locations only. | $40,000 |
| Mar 29, 2022 | Completed final sign-off Apr 2023 | 1080 Chestnut St | unit 11d: interior remodel. kitchen + baths. kitchen, bath's walls as shown on plan. remove all interior doors, trim, cabinetry, and plumbing fixtures at kitchen, bath's.Details
unit 11d: interior remodel. kitchen + baths. kitchen, bath's walls as shown on plan. remove all interior doors, trim, cabinetry, and plumbing fixtures at kitchen, bath's. | $20,000 |
| Dec 18, 2019 | Completed final sign-off Dec 2020 | 655 18th Av | ground fl remodel interior rooms on the 2nd fl remodel bath, replace all exterior rear windows. no additonal sf added. voluntary shearwalls.Details
ground fl remodel interior rooms on the 2nd fl remodel bath, replace all exterior rear windows. no additonal sf added. voluntary shearwalls. | $170,000 |
| Aug 15, 2019 | Completed final sign-off Mar 2020 | 2850 Cabrillo St | remove non-bearing interior partition. new full bath at 1st floor.Details
remove non-bearing interior partition. new full bath at 1st floor. | $35,360 |
| Apr 15, 2019 | Completed final sign-off Oct 2019 | 2201 Sacramento St | apt 101: remodel interior bathroom, kitchen, revise (e) plumbing locations, new fixtures, new electrical fixtures at (e) locations, new tile at bath floors, kithen relocate plumbing as per plan, new fixtures, paint through out, washier and dryer added, removal of electric fire place n/a maherDetails
apt 101: remodel interior bathroom, kitchen, revise (e) plumbing locations, new fixtures, new electrical fixtures at (e) locations, new tile at bath floors, kithen relocate plumbing as per plan, new fixtures, paint through out, washier and dryer added, removal of electric fire place n/a maher | $65,000 |
| Feb 27, 2014 | Completed final sign-off Aug 2014 | 1838 Laguna St | cosmetic interior remodeling at two existing 2/f baths. replacing vanities, toilets, shower pan, & curb at west bath, & tile.Details
cosmetic interior remodeling at two existing 2/f baths. replacing vanities, toilets, shower pan, & curb at west bath, & tile. | $40,000 |
| Oct 26, 2011 | Completed final sign-off Mar 2012 | 753 Vermont St | revision to app#201012176901 for the following changes: 1) interior remodeling at 2nd floor to expand bath 1 and reconfigure the adjacent bedroom 1 walkin closet, 2) removal of the fireplace/heater from bedroom 1 and to change door #6 to the room,3) change the door and window configuration at theDetails
revision to app#201012176901 for the following changes: 1) interior remodeling at 2nd floor to expand bath 1 and reconfigure the adjacent bedroom 1 walkin closet, 2) removal of the fireplace/heater from bedroom 1 and to change door #6 to the room,3) change the door and window configuration at the | |
| Oct 4, 2011 | Completed final sign-off Dec 2011 | 1435 12th Av | sound proof extg 1st floor work room. all exterior walls and ceiling, replace extg windows with double pane casements. add bathroom into extg work room.install addtional receptacles and lights.Details
sound proof extg 1st floor work room. all exterior walls and ceiling, replace extg windows with double pane casements. add bathroom into extg work room.install addtional receptacles and lights. | $30,000 |
| Dec 17, 2010 | Completed final sign-off Mar 2012 | 753 Vermont St | rear addition with one and two story portions and replacement bath. interior remodeling at existing second floor rear bedroom, five new skylights at existing roof. total increase in habitable space =324 sqft. excavation and new patio and retaining walls at rear yard.Details
rear addition with one and two story portions and replacement bath. interior remodeling at existing second floor rear bedroom, five new skylights at existing roof. total increase in habitable space =324 sqft. excavation and new patio and retaining walls at rear yard. | $85,000 |
| Sep 1, 2009 | Completed final sign-off Jun 2010 | 1570 16th Av | kitchen remodel w/ (n) roof construction. guest bath remodel. enclosure of (e) entry; (n) 150 sq.ft. of conditioned space. (n) roof. (n) furnace, lighting + upgrade misc. services. (n) stucco @ front & side + landscape at front.Details
kitchen remodel w/ (n) roof construction. guest bath remodel. enclosure of (e) entry; (n) 150 sq.ft. of conditioned space. (n) roof. (n) furnace, lighting + upgrade misc. services. (n) stucco @ front & side + landscape at front. | $120,000 |
| Apr 7, 2005 | Completed final sign-off Jun 2005 | 2845 Union St | retiling of 2 bathrooms with new fixtures & accessories; water damage repair including refinishingDetails
retiling of 2 bathrooms with new fixtures & accessories; water damage repair including refinishing | $52,000 |