Doherty Restoration, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2010 to Jul 2026
- Last 24 months
- 13 permits filed
253 permits since 2000: 202 completed, 5 in progress, 32 never finaled, 14 expired or cancelled.
Of the 32 never-finaled permits, 8 are 3 to 5 years old, 15 are 5 to 10 years old, 9 are over 10 years old. 5 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
3 roof deck permits: 3 completed. Typically 232 days from filing to permit and 552 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 6, 2023 | Completed final sign-off Jul 2025 | 246 Alma St | eliminate (1)residential unit @ grd level,expand top unit(250)down into portion of 2nd level(248). expand bottow unit (246) up into a portion (248). change bldg from to r-2 to r-3. infill (e) lightwell. reconfig all flrs, install roof access & roof deck less than 500 sq ft.Details
eliminate (1)residential unit @ grd level,expand top unit(250)down into portion of 2nd level(248). expand bottow unit (246) up into a portion (248). change bldg from to r-2 to r-3. infill (e) lightwell. reconfig all flrs, install roof access & roof deck less than 500 sq ft. | $300,000 |
| Feb 26, 2015 | Completed final sign-off Jun 2019 | 2355 Bay St | vertical addition. installation of a roof deck on 4th story. full interior renovationof 4th unit. expand unit 4 into (n) 4th story addition. convert to 3 bedroom, 3 bath layout.Details
vertical addition. installation of a roof deck on 4th story. full interior renovationof 4th unit. expand unit 4 into (n) 4th story addition. convert to 3 bedroom, 3 bath layout. | $50,000 |
| Feb 15, 2013 | Completed final sign-off Feb 2014 | 544 Hill St | new master bath (2nd floor), relocate kitchen, renovate basement, powder room, bathroom, new roof deck, replace exterior stair.Details
new master bath (2nd floor), relocate kitchen, renovate basement, powder room, bathroom, new roof deck, replace exterior stair. | $225,000 |