Doherty Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2023 to Jun 2025
- Last 24 months
- 2 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 1 days from filing to permit and 57 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2025 | Completed final sign-off Aug 2025 | 447 42nd Av | replace dry rotted section of the stud wall at lightwell. voluntary strengthening seismic resident elements, strengthen staircase by nailing exterior wallDetails
replace dry rotted section of the stud wall at lightwell. voluntary strengthening seismic resident elements, strengthen staircase by nailing exterior wall | $5,000 |