Permit GraphShortlistSan Francisco building permits since 2000

Doherty Construction

Contractor license
1098696
State license record
Based in
San Francisco
On San Francisco permits
Jan 2023 to Jun 2025
Last 24 months
2 permits filed

3 permits since 2000: 2 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is 3 to 5 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllStairs 1

1 stairs permit: 1 completed. Typically 1 days from filing to permit and 57 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jun 25, 2025Completed
final sign-off Aug 2025
447 42nd Avreplace dry rotted section of the stud wall at lightwell. voluntary strengthening seismic resident elements, strengthen staircase by nailing exterior wall
Details
Permit
202506259395
Status
complete
Filed
Jun 25, 2025
Permit issued
Jun 26, 2025
Final sign-off
Aug 22, 2025
Declared cost
$5,000
Address
447 42nd Av

replace dry rotted section of the stud wall at lightwell. voluntary strengthening seismic resident elements, strengthen staircase by nailing exterior wall

Open the permit page

$5,000