Dliu Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2014 to Jul 2026
- Last 24 months
- 12 permits filed
121 permits since 2000: 91 completed, 4 in progress, 18 never finaled, 8 expired or cancelled.
Of the 18 never-finaled permits, 4 are 3 to 5 years old, 14 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
20 stairs permits: 18 completed, 1 never finaled, 1 expired or cancelled. Typically 6 days from filing to permit and 269 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2025 | Completed final sign-off Nov 2025 | 765 34th Av | front stair replacement like to likeDetails
front stair replacement like to like | $5,000 |
| Jul 9, 2024 | Completed final sign-off Jan 2025 | 1400 Geneva Av | to comply w/ nov# 202424621: replace (e) stair with new stair in kind. repair in kind.Details
to comply w/ nov# 202424621: replace (e) stair with new stair in kind. repair in kind. | $40,000 |
| May 13, 2024 | Completed final sign-off Feb 2025 | 254 Beverly St | 2nd fl - remodel of kitchen, bathroom & bedroom; remodel of (e) bathroom interior only with no change to bathroom envelope; relocate interior stairway and add new skylights per plan. no change to (e) building envelope. structural strengthening where needed for interior remodeling per plansDetails
2nd fl - remodel of kitchen, bathroom & bedroom; remodel of (e) bathroom interior only with no change to bathroom envelope; relocate interior stairway and add new skylights per plan. no change to (e) building envelope. structural strengthening where needed for interior remodeling per plans | $150,000 |
| May 18, 2023 | Completed final sign-off Mar 2024 | 691 Madrid St | minor residential interior remodel of sfr, ground flr remodel for habitable space for total of 2 bedrm, 1 media & 1 bath. remodel of second flr, per plans to have total 2 beds, 2 bath, relocate int. stair, re-roof of extg roof where needed strucctural strengthening where needed per structural drawinDetails
minor residential interior remodel of sfr, ground flr remodel for habitable space for total of 2 bedrm, 1 media & 1 bath. remodel of second flr, per plans to have total 2 beds, 2 bath, relocate int. stair, re-roof of extg roof where needed strucctural strengthening where needed per structural drawin | $250,000 |
| Jan 25, 2023 | Never finaled issued Jul 2023, no final | 370 Parnassus Av | 2nd revision to pa# 201412042987. dental office floor plan revised to allow larger waiting/reception, add staff bath, relocate janitor's closet, add x-ray area. garage lvl revised to add electrical rm w/ elec. mtrs & direct access for pg&e & change exist stair at rear for lvl access to gas metersDetails
2nd revision to pa# 201412042987. dental office floor plan revised to allow larger waiting/reception, add staff bath, relocate janitor's closet, add x-ray area. garage lvl revised to add electrical rm w/ elec. mtrs & direct access for pg&e & change exist stair at rear for lvl access to gas meters | |
| Dec 1, 2022 | Completed final sign-off May 2024 | 2470 23rd Av | 1st fl remodel of habitable space for 2 bed, 1 media room, 2 bath. remodel of 2nd fl per plans. add new skylights. infill (e) courtyard & (e) lightwell against blank neighbor wall at property line. new rear deck w/ stairs at rear. eg 02 for eero at the rear of building, review no inspection for fireDetails
1st fl remodel of habitable space for 2 bed, 1 media room, 2 bath. remodel of 2nd fl per plans. add new skylights. infill (e) courtyard & (e) lightwell against blank neighbor wall at property line. new rear deck w/ stairs at rear. eg 02 for eero at the rear of building, review no inspection for fire | $225,000 |
| Sep 16, 2022 | Completed final sign-off Jan 2023 | 35 Reposa Wy | remodel bathron on 2nd fl; remodel (e) non-bearing kitchen wall on 2nd fl; add media room and bathroom on ground floor; no excavation proposed relocate interior stairs and new windows and doors at rear of building; enclose 2nd fl lightwell; 3 skylights,Details
remodel bathron on 2nd fl; remodel (e) non-bearing kitchen wall on 2nd fl; add media room and bathroom on ground floor; no excavation proposed relocate interior stairs and new windows and doors at rear of building; enclose 2nd fl lightwell; 3 skylights, | $85,000 |
| Jul 26, 2022 | Completed final sign-off Feb 2023 | 2552 24th Av | interior remodel of 2nd fl kitchen and bath. add habitable space to e garage /storage to 1 bedroom, 2 baths, laundry and media room. no change to e exterior building envelope. relocate e interior stairway to compliant stairs, per plans. rear windows per plans,Details
interior remodel of 2nd fl kitchen and bath. add habitable space to e garage /storage to 1 bedroom, 2 baths, laundry and media room. no change to e exterior building envelope. relocate e interior stairway to compliant stairs, per plans. rear windows per plans, | $150,000 |
| Jun 7, 2022 | Completed final sign-off Aug 2022 | 217 Juanita Wy | remodel bathrooms on (e) 3/f & 2/f. relocate non-bearing kitchen wall & kitchen remodel. convert (e) garage/storage to one bedroo, bathroom, mud room on g/f. no excavation proposed. relocate interior stair per plan.Details
remodel bathrooms on (e) 3/f & 2/f. relocate non-bearing kitchen wall & kitchen remodel. convert (e) garage/storage to one bedroo, bathroom, mud room on g/f. no excavation proposed. relocate interior stair per plan. | $150,000 |
| Sep 14, 2021 | Completed final sign-off Mar 2022 | 1554 20th Av | revision 202102054161. eliminate new residential unit at 1st fl. open wall for stair connection between 2 floors. infill windows and pour and install new windows in new bedroom 5 on 1st fl. revision to 202010076118 to revise window size on rear left.Details
revision 202102054161. eliminate new residential unit at 1st fl. open wall for stair connection between 2 floors. infill windows and pour and install new windows in new bedroom 5 on 1st fl. revision to 202010076118 to revise window size on rear left. | |
| Oct 3, 2020 | Completed final sign-off Dec 2021 | 551 Monterey Bl | to comply w/ his n.o.v 201920821. stairs to be fixed. repair stairs at rear of buildingDetails
to comply w/ his n.o.v 201920821. stairs to be fixed. repair stairs at rear of building | $1,000 |
| Mar 27, 2019 | Completed final sign-off Dec 2021 | 551 Monterey Bl | provide handrails for rear stairway to comply with nov 201920821Details
provide handrails for rear stairway to comply with nov 201920821 | $4,000 |
| Feb 13, 2019 | Completed final sign-off Feb 2020 | 938 Ingerson Av | comply w/ complaint 201853881,201842451 & 200874536; const 2 bed rm, 2 bath rm & family rm. at ground fl. remodel (e) kitchen, bath rm. add 3 bath rm. & replace sheet rock w/new at 2nd fl, const 2 bed rm, 2 bath rm, media rm at lower fl. & re-build (e) interior staircase grd flr. down to lower fl;Details
comply w/ complaint 201853881,201842451 & 200874536; const 2 bed rm, 2 bath rm & family rm. at ground fl. remodel (e) kitchen, bath rm. add 3 bath rm. & replace sheet rock w/new at 2nd fl, const 2 bed rm, 2 bath rm, media rm at lower fl. & re-build (e) interior staircase grd flr. down to lower fl; | $158,000 |
| Aug 16, 2018 | Completed final sign-off Aug 2020 | 2070 Green St | basement: add 3 bedrms, wine room, media, & int. stairs. 1/f: relocate kitchen, remodel bath, & add laundry. 2/f: remodel bath, add 1 bedrm, 1 bath, & 1 office. 3/f: remodel kitchen & bath. add office & pantry. new elevator to all flrs, infill east & west lightwell. n roof deck & balconies.Details
basement: add 3 bedrms, wine room, media, & int. stairs. 1/f: relocate kitchen, remodel bath, & add laundry. 2/f: remodel bath, add 1 bedrm, 1 bath, & 1 office. 3/f: remodel kitchen & bath. add office & pantry. new elevator to all flrs, infill east & west lightwell. n roof deck & balconies. | $200,000 |
| May 2, 2018 | Expired or cancelled expired May 2019 | 1001 Portola Dr | to comply with nov 201858863 repair existing front stair in kind. keep exterior finishes in kind, shape in kind.Details
to comply with nov 201858863 repair existing front stair in kind. keep exterior finishes in kind, shape in kind. | $8,000 |
| Apr 17, 2018 | Completed final sign-off May 2019 | 842 Lyon St | 1st fl:add 1 bedrm, 1 fam rm, 1 office, 1 bath, 1 laundry, new stairs to 2nd fl. 2nd fl: remodel kitchen, bath, add bath, 1 den, cantilever deck at rear. 3rd fl, remodel kitchen, bath, add 1.5 baths, 1 den, 1 laundry, cantilever deck, new roof deck. match so lightwell with neighor.fully sprinkler.Details
1st fl:add 1 bedrm, 1 fam rm, 1 office, 1 bath, 1 laundry, new stairs to 2nd fl. 2nd fl: remodel kitchen, bath, add bath, 1 den, cantilever deck at rear. 3rd fl, remodel kitchen, bath, add 1.5 baths, 1 den, 1 laundry, cantilever deck, new roof deck. match so lightwell with neighor.fully sprinkler. | $160,000 |
| Apr 10, 2018 | Completed final sign-off Aug 2018 | 228 Liberty St | modify extg permit #201802060495 . replace inkind stair tower. extg permit is repair less than 50%. this permit is replace in kind.Details
modify extg permit #201802060495 . replace inkind stair tower. extg permit is repair less than 50%. this permit is replace in kind. | $10,000 |
| Jan 12, 2018 | Completed final sign-off Jun 2018 | 39 West View Av | relocate e kitchen, add 1 new bath, convert e kitchen space to bedroom 2nd fl. construct 1 bdrm, family rm, 1 full bath at gr fl, consruct new deck w staircase at rear of building approx 18 x 7 maher not reqDetails
relocate e kitchen, add 1 new bath, convert e kitchen space to bedroom 2nd fl. construct 1 bdrm, family rm, 1 full bath at gr fl, consruct new deck w staircase at rear of building approx 18 x 7 maher not req | $56,000 |
| May 22, 2017 | Completed final sign-off Jul 2024 | 107 De Soto St | revision to pa#201704264928, 1/f: change sliding door to window, delete on sliding door, re-arrange bathroom fixtures, add a wet bar, 2/f: relocate bathroom, kitchen cabinet, skylights, add a powder room, add a spiral stair.Details
revision to pa#201704264928, 1/f: change sliding door to window, delete on sliding door, re-arrange bathroom fixtures, add a wet bar, 2/f: relocate bathroom, kitchen cabinet, skylights, add a powder room, add a spiral stair. | $15,000 |
| May 2, 2017 | Completed final sign-off Feb 2018 | 68 Mccoppin St | provide new kitchen layout in unit #1 of subject building. no exterior modifications. new guardrail at stairs & mezzanineDetails
provide new kitchen layout in unit #1 of subject building. no exterior modifications. new guardrail at stairs & mezzanine | $5,000 |