Back to kitchen remodel contractors
Direct Home Remodeling Inc
- Based in
- San Jose
- On San Francisco permits
- Jul 2019 to Dec 2021
- Last 24 months
- 0 permits filed
13 permits since 2000: 10 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 3 completed, 1 never finaled. Typically 160 days from filing to permit and 423 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2021 | Completed final sign-off Nov 2022 | 258 Guerrero St | 1st fl: remove wall between kitchen & dining room to create open layout. turn (e) living room into master bedroom. add one master bathroom & w.i.c.Details
1st fl: remove wall between kitchen & dining room to create open layout. turn (e) living room into master bedroom. add one master bathroom & w.i.c. | $50,000 |
| Mar 2, 2021 | Never finaled issued Jun 2022, no final | 2265 Union St | addition and remodel of (e) 4 story sfh. add new garage, storage, & gym at basement level. add an elevator & new exterior stair in rear. two new bedrooms & baths on 1/f. remodel (e) 2/f living room, family room, & kitchen. remodel of bedrooms & baths on 3/f. remodel 4/f to add master bedroom suiteDetails
addition and remodel of (e) 4 story sfh. add new garage, storage, & gym at basement level. add an elevator & new exterior stair in rear. two new bedrooms & baths on 1/f. remodel (e) 2/f living room, family room, & kitchen. remodel of bedrooms & baths on 3/f. remodel 4/f to add master bedroom suite | $620,000 |
| Dec 23, 2020 | Completed final sign-off May 2022 | 1966 Pacific Av | unit #203: kitchen, master bathroom, hallway bathroom, and laundry toom remodel. sub-panel upgrade, and non-bearing wall removal.Details
unit #203: kitchen, master bathroom, hallway bathroom, and laundry toom remodel. sub-panel upgrade, and non-bearing wall removal. | $56,000 |
| Oct 10, 2020 | Completed final sign-off May 2023 | 134 Rome St | change internal stair run on floor 1. update restroom on floor 1. remodel kitchen. existing atrium to be enclosed with a skylight.Details
change internal stair run on floor 1. update restroom on floor 1. remodel kitchen. existing atrium to be enclosed with a skylight. | $12,000 |