Back to kitchen remodel contractors
Dintcho Construction Inc Dba Envision Au
- Based in
- Burlingame
- On San Francisco permits
- Jan 2010 to Jan 2025
- Last 24 months
- 1 permit filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 never finaled. Typically 2 days from filing to permit and 30 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 6, 2025 | Completed final sign-off Feb 2025 | 411 Marietta Dr | replace back windows. not visible from street. maple vinyl & fibrex. 4 picture windows, 1 sliding door, 1 small window by kitchen.Details
replace back windows. not visible from street. maple vinyl & fibrex. 4 picture windows, 1 sliding door, 1 small window by kitchen. | $8,000 |
| Jan 19, 2010 | Never finaled issued Jan 2010, no final | 709 Eugenia Av | kitchen remodel . no wall removal. remove existing tile floor and refinish wood. replace cabinets and appliances with new ones. move 2 plugs, add switch and light (min 50% of kitchen lighting wattage shall be of high efficancy lights)Details
kitchen remodel . no wall removal. remove existing tile floor and refinish wood. replace cabinets and appliances with new ones. move 2 plugs, add switch and light (min 50% of kitchen lighting wattage shall be of high efficancy lights) | $3,000 |