Dijeau Poage Construction Inc.
- Based in
- Burlingame
- On San Francisco permits
- Jun 2008 to Oct 2026
- Last 24 months
- 9 permits filed
149 permits since 2000: 110 completed, 8 in progress, 12 never finaled, 19 expired or cancelled.
Of the 12 never-finaled permits, 4 are 3 to 5 years old, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
16 stairs permits: 11 completed, 2 in progress, 1 never finaled, 2 expired or cancelled. Typically 10 days from filing to permit and 274 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 9, 2024 | In progress issued Aug 2024 | 200 Seacliff Av | rev 202312263099- to include additional in kind door replacement at front facade. in kind garage door a light replacememnt. square off corners of (e) rear deck and replace interior and exterior stairDetails
rev 202312263099- to include additional in kind door replacement at front facade. in kind garage door a light replacememnt. square off corners of (e) rear deck and replace interior and exterior stair | $15,000 |
| Dec 26, 2023 | In progress issued Feb 2024 | 200 Seacliff Av | replace front entry door & rear facade exterior doors & windows. renovate main kitchen & 1st floor wetbar. replace guardrails on all rear terraces. replace guardrail (e) interior spiral stair. replace (e) fireplace & all plumbing fixtures.Details
replace front entry door & rear facade exterior doors & windows. renovate main kitchen & 1st floor wetbar. replace guardrails on all rear terraces. replace guardrail (e) interior spiral stair. replace (e) fireplace & all plumbing fixtures. | $85,000 |
| Jun 30, 2023 | Completed final sign-off Jun 2025 | 2615 Union St | no change to proposed building mass,height, setback, ftprnt.no work public right of way.e boundry walls and fences to remain. remodel rear yard to replace e concrete retaining walls,planter walls, landcape features,stairs. e con grill area to be demo'd new bbq area to be built in new location.Details
no change to proposed building mass,height, setback, ftprnt.no work public right of way.e boundry walls and fences to remain. remodel rear yard to replace e concrete retaining walls,planter walls, landcape features,stairs. e con grill area to be demo'd new bbq area to be built in new location. | $100,000 |
| Apr 6, 2023 | Completed final sign-off Jun 2025 | 2615 Union St | no change to bldg. height, massing, or setbacks. add wall to return bldg to (2) units. changes to interior wall partitions. main stair redesign, replacement of finishes & fixture throughout 1st & 2nd levels. changes to some (e) openings. replacment of some facade materials.Details
no change to bldg. height, massing, or setbacks. add wall to return bldg to (2) units. changes to interior wall partitions. main stair redesign, replacement of finishes & fixture throughout 1st & 2nd levels. changes to some (e) openings. replacment of some facade materials. | $500,000 |
| Dec 2, 2019 | Completed final sign-off Jun 2020 | 990 Chestnut St | replace like and kind of common area lighting w/led lighting at lobby and stairsDetails
replace like and kind of common area lighting w/led lighting at lobby and stairs | $10,000 |
| Sep 24, 2018 | Completed final sign-off Jun 2019 | 3947 Washington St | revision to pa 201801037795. interior stair change from wood to steel. maher n/aDetails
revision to pa 201801037795. interior stair change from wood to steel. maher n/a | |
| Jun 20, 2016 | Completed final sign-off Aug 2016 | 266 Magellan Av | rear yard stair repair: replace all railing of extg exterior stair. all post stringers, decking and treads to remain. new posts, glass railings and metal handrails to be added.Details
rear yard stair repair: replace all railing of extg exterior stair. all post stringers, decking and treads to remain. new posts, glass railings and metal handrails to be added. | $2,500 |
| Jun 12, 2015 | Completed final sign-off Apr 2016 | 4930 17th St | renovation of e 2 units residential at 1st, 2nd fl. 25 % reallocation of 1st fl unit 4932, new kitchen and interior stair. removal of exterior statirs, new terrace at rear, replace doors and windows at 1st flDetails
renovation of e 2 units residential at 1st, 2nd fl. 25 % reallocation of 1st fl unit 4932, new kitchen and interior stair. removal of exterior statirs, new terrace at rear, replace doors and windows at 1st fl | $150,000 |
| Oct 1, 2012 | Completed final sign-off Sep 2013 | 1545 Beach St | interior remodel of ground flr. to include (n) full bath (n) media rm. laundry rm. & interior stairs. 2nd. flr.: infill atrium space @ center. expand & remodel kitchen, (n) hallway to split bedrms & remodel bathroom.Details
interior remodel of ground flr. to include (n) full bath (n) media rm. laundry rm. & interior stairs. 2nd. flr.: infill atrium space @ center. expand & remodel kitchen, (n) hallway to split bedrms & remodel bathroom. | $150,000 |
| Jan 27, 2011 | Completed final sign-off Sep 2012 | 2625 Baker St | partial interior renovation; horizontal expansion at rear of basement and first levels, slight relocation of entry stair and door; extension to rear at attic level dormer; new rear exterior stair.Details
partial interior renovation; horizontal expansion at rear of basement and first levels, slight relocation of entry stair and door; extension to rear at attic level dormer; new rear exterior stair. | $425,000 |
| Dec 1, 2010 | Completed final sign-off Feb 2011 | 4316 23rd St | pull apart a few treads and risers to inspect whre water is infiltrating, repair/repl stairs like in kind, repair front deck framing from dry rot associated with the water infiltration, less than 50% of front porch, repl deck stairs and fraiming @ entryDetails
pull apart a few treads and risers to inspect whre water is infiltrating, repair/repl stairs like in kind, repair front deck framing from dry rot associated with the water infiltration, less than 50% of front porch, repl deck stairs and fraiming @ entry | $5,000 |
| May 29, 2009 | Expired or cancelled expired Apr 2013 | 3949 Washington St | dryrot repair fo exterior stairs form the rear yard to the rear terrace. ref pa #200905228974.Details
dryrot repair fo exterior stairs form the rear yard to the rear terrace. ref pa #200905228974. | $8,000 |
| May 22, 2009 | Expired or cancelled expired Apr 2013 | 3949 Washington St | exploratory demo, dry rot replacement where necessary, back yard stairs, stoop, handrail.Details
exploratory demo, dry rot replacement where necessary, back yard stairs, stoop, handrail. | $1,000 |
| May 4, 2009 | Never finaled issued May 2009, no final | 200 Seacliff Av | create new interior stair from (e) habitable first floor to (e) habitable basement. no exterior work.Details
create new interior stair from (e) habitable first floor to (e) habitable basement. no exterior work. | $100,000 |
| Feb 19, 2009 | Completed final sign-off Jul 2009 | 2355 Washington St | revision to pa #200901099870, roofing & ceiling reinforcement, stair reinft & plywood stapping at 2nd fl master bathrm, brick footing reinforcement at lower level hall way area.Details
revision to pa #200901099870, roofing & ceiling reinforcement, stair reinft & plywood stapping at 2nd fl master bathrm, brick footing reinforcement at lower level hall way area. | $8,500 |
| Jan 9, 2009 | Completed final sign-off Jul 2009 | 2355 Washington St | bathroom & laundry renovation in both units, new laundry stair from lower level to 1st level. lower level wine cellar & pantry (storage) area. remodel bathroom on 3rd level. removal of existing lower level spiral staircase.Details
bathroom & laundry renovation in both units, new laundry stair from lower level to 1st level. lower level wine cellar & pantry (storage) area. remodel bathroom on 3rd level. removal of existing lower level spiral staircase. | $250,000 |