Back to kitchen remodel contractors
Dickens Thomas Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2006 to May 2021
- Last 24 months
- 0 permits filed
4 permits since 2000: 2 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 204 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 18, 2021 | Completed final sign-off Dec 2021 | 2930 Van Ness Av | interior remodel: new shower in (e) bath at 3ed fl. replace finishes in bath at 2nd fl. replace a tub w/ a shower at 1st fl bath. remove a load-bearing partition & infill (e) door in kitchen.Details
interior remodel: new shower in (e) bath at 3ed fl. replace finishes in bath at 2nd fl. replace a tub w/ a shower at 1st fl bath. remove a load-bearing partition & infill (e) door in kitchen. | $72,000 |