Back to kitchen remodel contractors
Diaz Construction
- Based in
- Menlo Park
- On San Francisco permits
- May 2014 to Jun 2026
- Last 24 months
- 4 permits filed
17 permits since 2000: 11 completed, 3 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
8 kitchen remodel permits: 3 completed, 3 in progress, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2026 | In progress issued Jun 2026 | 2058 Greenwich St | like for like bathroom remodel. like for like kitchen remodel.Details
like for like bathroom remodel. like for like kitchen remodel. | $25,000 |
| Jun 4, 2026 | In progress issued Jun 2026 | 2060 Greenwich St | like for like bathrooms remodels x 2. like for like kitchen remodelDetails
like for like bathrooms remodels x 2. like for like kitchen remodel | $35,000 |
| Jun 17, 2025 | In progress issued Jun 2025 | 289 Nevada St | (2) like for like bathroom remodel. update lights and plumbing. (1) like for like kitchen renovation.Details
(2) like for like bathroom remodel. update lights and plumbing. (1) like for like kitchen renovation. | $26,000 |
| Jun 21, 2022 | Expired or cancelled withdrawn Jun 2023 | 465 30th St | main lvl - kitchen remodel. basement remodel - new laundry, new bathroom, relocate furnace & water heater, conversion of crawl space to living space. new staircase - basement to attic. window replacement & new sliding door to exterior. roof alterations - 4 new dormers.Details
main lvl - kitchen remodel. basement remodel - new laundry, new bathroom, relocate furnace & water heater, conversion of crawl space to living space. new staircase - basement to attic. window replacement & new sliding door to exterior. roof alterations - 4 new dormers. | $120,000 |
| Jun 16, 2022 | Completed final sign-off Mar 2023 | 3650 17th St | remodel (e) kitchen and bathroom. addition of (n) full bath. (n) skylights per plan.Details
remodel (e) kitchen and bathroom. addition of (n) full bath. (n) skylights per plan. | $250,000 |
| Apr 27, 2022 | Completed final sign-off Sep 2022 | 1325 11th Av | bathroom 1 - move sink vanity; add toilet; replace all fixtures; bathroom 2 - move partition wall; add sink; replace toilet; kitchen - replace refrigerator; replace hood (stove) and upgrade electrical and plumbing to codeDetails
bathroom 1 - move sink vanity; add toilet; replace all fixtures; bathroom 2 - move partition wall; add sink; replace toilet; kitchen - replace refrigerator; replace hood (stove) and upgrade electrical and plumbing to code | $21,000 |
| Apr 25, 2022 | Completed final sign-off Jan 2023 | 1143 Fell St | like for like bathroom remodel. like for like kitchen remodel. new lights location, new plumbing for bathroom fixtures.Details
like for like bathroom remodel. like for like kitchen remodel. new lights location, new plumbing for bathroom fixtures. | $40,000 |
| Jun 4, 2021 | Never finaled issued Jun 2021, no final | 165 Moffitt St | kitchen remodel: remove (e) cabinets & replace in kind. install new electric to bring kitche to code. replace plumbing for sink as needed. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)3Details
kitchen remodel: remove (e) cabinets & replace in kind. install new electric to bring kitche to code. replace plumbing for sink as needed. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)3 | $30,000 |