Back to bathroom remodel contractors
Diamond Home Restoration
- Based in
- San Francisco
- On San Francisco permits
- Sep 2010 to Feb 2020
- Last 24 months
- 0 permits filed
34 permits since 2000: 28 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 never finaled. Typically 7 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 4, 2018 | Completed final sign-off Jun 2018 | 1870 Jackson St | unit #202: custom kitchen remodel: removal of non bearing wall, refinish extg bathrooms, replace plumbing fixtures, lighting and power modification per plans. n/a for maher.Details
unit #202: custom kitchen remodel: removal of non bearing wall, refinish extg bathrooms, replace plumbing fixtures, lighting and power modification per plans. n/a for maher. | $38,000 |
| Jul 27, 2017 | Completed final sign-off Mar 2019 | 1664 Page St | demo pantry & install new cabinets in kitchen, new beam & posts to support proposed opening between dining & kitchen. remodel (e) bathroom & add new bathroomDetails
demo pantry & install new cabinets in kitchen, new beam & posts to support proposed opening between dining & kitchen. remodel (e) bathroom & add new bathroom | $35,000 |
| Sep 7, 2016 | Completed final sign-off Mar 2017 | 33 19th Av | (e) family room.bedroom remodel. (e) bathroom reconfigure. partially remove (e) bearing wall - new beam. plumb/ele/mech modifications as reqdDetails
(e) family room.bedroom remodel. (e) bathroom reconfigure. partially remove (e) bearing wall - new beam. plumb/ele/mech modifications as reqd | $22,000 |
| Jan 13, 2014 | Completed final sign-off May 2014 | 229 Brannan St | upgrade fixtures and finishes in 2 existing bathrooms. no locations to move.Details
upgrade fixtures and finishes in 2 existing bathrooms. no locations to move. | $65,000 |
| Jun 28, 2013 | Never finaled issued Apr 2015, no final | 200 Clayton St | demolition of the east most portion of house, new wood deck to replace. demolished portion of house @1/f. new roof dormer. re-built shed roof @south-east side of the house. new bathroom at (e) bedroom. interior remodel portions of storage, 1st floor and 2nd floors of the house.Details
demolition of the east most portion of house, new wood deck to replace. demolished portion of house @1/f. new roof dormer. re-built shed roof @south-east side of the house. new bathroom at (e) bedroom. interior remodel portions of storage, 1st floor and 2nd floors of the house. | $600,000 |
| Dec 14, 2012 | Completed final sign-off May 2013 | 1787 48th Av | 1st floor:creation of a new livable area with new master bedroom/bathroom and home office. replacement of 3 extg footings. relocation of mechanical equipment/laundry. 2nd floor:open extg non-beraing wall for new breakfast bar, replacement of kitchen cabinets and fixtures, bathroom remodeling.Details
1st floor:creation of a new livable area with new master bedroom/bathroom and home office. replacement of 3 extg footings. relocation of mechanical equipment/laundry. 2nd floor:open extg non-beraing wall for new breakfast bar, replacement of kitchen cabinets and fixtures, bathroom remodeling. | $85,000 |
| Jun 23, 2011 | Completed final sign-off Jul 2012 | 1041 Lake St | new dormer addition at the east side of the building at 3'-0" from property line. expansion will allow to remodel a (e) bathroom at 4th level. also 7 new skylights located more than 5'-0" from property line. new 1-hour fire wall and roof in the proposed dormer.Details
new dormer addition at the east side of the building at 3'-0" from property line. expansion will allow to remodel a (e) bathroom at 4th level. also 7 new skylights located more than 5'-0" from property line. new 1-hour fire wall and roof in the proposed dormer. | $40,000 |