Diamond Building & Construction
- Based in
- San Rafael
- On San Francisco permits
- Oct 2005 to Jun 2009
- Last 24 months
- 0 permits filed
14 permits since 2000: 12 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 127 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 27, 2009 | Completed final sign-off May 2009 | 2806 Union St | kitchen remodel, replace cabinets, tile floor, replace one window in kitchen and one in the bedroom like to like same size windows as existing with double pane. no structural changes.Details
kitchen remodel, replace cabinets, tile floor, replace one window in kitchen and one in the bedroom like to like same size windows as existing with double pane. no structural changes. | $40,000 |
| Sep 18, 2008 | Completed final sign-off Jan 2009 | 2806 Union St | work @ unit# 4 only. complete kitchen & bathroom remodel. replace cabinets & countertops & tile floor. redo bathroom, install new tub shower, vanity & toilet. tile floors & walls around tub. 50% kitchen light wattage in flourescent. flourescent or o.s. in bathroom.Details
work @ unit# 4 only. complete kitchen & bathroom remodel. replace cabinets & countertops & tile floor. redo bathroom, install new tub shower, vanity & toilet. tile floors & walls around tub. 50% kitchen light wattage in flourescent. flourescent or o.s. in bathroom. | $50,000 |
| Jul 2, 2008 | Completed final sign-off Sep 2008 | 2806 Union St | unit 6 - kitchen and bathroom remodel. bathroom remodel will not have electrical done. window replacement same size, u-factor max 0.67.Details
unit 6 - kitchen and bathroom remodel. bathroom remodel will not have electrical done. window replacement same size, u-factor max 0.67. | $60,000 |
| Jul 2, 2008 | Completed final sign-off Nov 2008 | 322 Rome St | kitchen remodel - replace cabinets, upgrade lights & receptacles, new tile floor.Details
kitchen remodel - replace cabinets, upgrade lights & receptacles, new tile floor. | $45,000 |
| Mar 14, 2007 | Completed final sign-off Nov 2007 | 1962 Jefferson St | kitchen remodel: install light fixtures, install countertop, install new sink, at least 50% lighting wattage must be flourescent.Details
kitchen remodel: install light fixtures, install countertop, install new sink, at least 50% lighting wattage must be flourescent. | $17,900 |