Devart8 Builders Inc
- Based in
- San Jose
- On San Francisco permits
- Aug 2025 to Sep 2025
- Last 24 months
- 2 permits filed
2 permits since 2000: 1 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 in progress. Typically 14 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2025 | In progress issued Sep 2025 | 627 28th Av | garage staircase removal- 2nd floor master bathroom remodel. 2nd floor hall closet removal and remodel hall bathroom. roof addition over entry stairwell with skylight. entry remodel (n) electric at entry master and hall bathroom and bedroom (2) fans. convert 2nd floor bedroom to officeDetails
garage staircase removal- 2nd floor master bathroom remodel. 2nd floor hall closet removal and remodel hall bathroom. roof addition over entry stairwell with skylight. entry remodel (n) electric at entry master and hall bathroom and bedroom (2) fans. convert 2nd floor bedroom to office | $85,000 |