Back to kitchen remodel contractors
Design & Build Contrating Services
- Based in
- Modesto
- On San Francisco permits
- Jul 2018 to Oct 2018
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 111 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 3, 2018 | Completed final sign-off Oct 2018 | 2200 45th Av | interior remodel and replace all windows in-kind w/aluminum clad wood windows. no other work. remodel kitchen & bathroom in-kind, same location/size, rewire house, change windows & (1) sliding door, new subpanel same size/location, new flooring, replumb whole houseDetails
interior remodel and replace all windows in-kind w/aluminum clad wood windows. no other work. remodel kitchen & bathroom in-kind, same location/size, rewire house, change windows & (1) sliding door, new subpanel same size/location, new flooring, replumb whole house | $45,000 |