Back to kitchen remodel contractors
Delta Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2000 to Nov 2012
- Last 24 months
- 0 permits filed
73 permits since 2000: 55 completed, 6 never finaled, 12 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 expired or cancelled. Typically 21 days from filing to permit and 288 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2010 | Completed final sign-off Mar 2011 | 125 20th Av | unit #125: remodel kitchen & bathrm., (n) wood entry door unit #127. replace (e) garage door repair less than 50% entry stair in-kind.Details
unit #125: remodel kitchen & bathrm., (n) wood entry door unit #127. replace (e) garage door repair less than 50% entry stair in-kind. | $68,000 |
| Jan 9, 2008 | Completed final sign-off May 2008 | 2815 22nd St | kitchen remodel, new electric, plumbing & replacement window @ lightwell(u= 0.67 max.), new furnace at garage, same location as existing. efficiency min. 78%.Details
kitchen remodel, new electric, plumbing & replacement window @ lightwell(u= 0.67 max.), new furnace at garage, same location as existing. efficiency min. 78%. | $18,000 |
| May 15, 2007 | Completed final sign-off Jun 2008 | 758 Clayton St | 2nd floor renovation of the existing kitchen, a new corner sink in the (e) w.c. and a (n) stair adding a half bath and shower room @ (e) 3rd floor. to comply with complaint.Details
2nd floor renovation of the existing kitchen, a new corner sink in the (e) w.c. and a (n) stair adding a half bath and shower room @ (e) 3rd floor. to comply with complaint. | $70,000 |
| May 4, 2007 | Expired or cancelled expired Aug 2008 | 124 Lower Tr | front bldg - rev. to 2004/10/07/6219/r-1 - stub out plumbing for future kitchen & bath for future fixture installation under future permit application. sf planning has approved future addt'l kitchen & plumbing pending future consolidation of (e) 2 unit residence per plan.Details
front bldg - rev. to 2004/10/07/6219/r-1 - stub out plumbing for future kitchen & bath for future fixture installation under future permit application. sf planning has approved future addt'l kitchen & plumbing pending future consolidation of (e) 2 unit residence per plan. | $500 |
| Jul 11, 2005 | Completed final sign-off Jul 2007 | 2639 39th Av | add rear addition with new location for dining/kitchen/living room, add another bedroomDetails
add rear addition with new location for dining/kitchen/living room, add another bedroom | $110,000 |