Back to bathroom remodel contractors
Del Castello Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Jun 2009
- Last 24 months
- 0 permits filed
15 permits since 2000: 14 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 145 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2009 | Completed final sign-off Nov 2009 | 196 College Av | remodel apt 196 kichn and laudry room new plmg wiring. new cabinets sink and counter tops. new flooring. new vanity in bathroom. new bath tub in same location new tile at tub area. new bath tub in same location. new tile at tub area. no sturctural work.Details
remodel apt 196 kichn and laudry room new plmg wiring. new cabinets sink and counter tops. new flooring. new vanity in bathroom. new bath tub in same location new tile at tub area. new bath tub in same location. new tile at tub area. no sturctural work. | $20,000 |
| Jul 13, 2007 | Completed final sign-off Dec 2007 | 860 Waller St | work @ unit# 1 only. remodel bathroom, new toilet, new shower, new basin, new marble at shower, wiring, plumbing @ 1st floor, unit# 1.Details
work @ unit# 1 only. remodel bathroom, new toilet, new shower, new basin, new marble at shower, wiring, plumbing @ 1st floor, unit# 1. | $10,000 |
| Apr 25, 2003 | Completed final sign-off Jun 2003 | 57 Turquoise Wy | remodel 1 bathroom, remove tile, shower walls and floor, install new shower pan, new vanity cabinetDetails
remodel 1 bathroom, remove tile, shower walls and floor, install new shower pan, new vanity cabinet | $8,900 |
| Dec 14, 2001 | Completed final sign-off Sep 2002 | 69 Sequoia Wy | add room @rear of garage area & new bathroom, remove 1 post at center wall, new window, insulate winDetails
add room @rear of garage area & new bathroom, remove 1 post at center wall, new window, insulate win | $28,000 |
| Aug 4, 2000 | Completed final sign-off Feb 2001 | 619 Teresita Bl | remodel kitchen & bathroom, new cabinets,appliances, countertops,tub, toilet,tile on wallsDetails
remodel kitchen & bathroom, new cabinets,appliances, countertops,tub, toilet,tile on walls | $15,000 |