Del Castello Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Jun 2009
- Last 24 months
- 0 permits filed
15 permits since 2000: 14 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2009 | Completed final sign-off Nov 2009 | 196 College Av | remodel apt 196 kichn and laudry room new plmg wiring. new cabinets sink and counter tops. new flooring. new vanity in bathroom. new bath tub in same location new tile at tub area. new bath tub in same location. new tile at tub area. no sturctural work.Details
remodel apt 196 kichn and laudry room new plmg wiring. new cabinets sink and counter tops. new flooring. new vanity in bathroom. new bath tub in same location new tile at tub area. new bath tub in same location. new tile at tub area. no sturctural work. | $20,000 |
| Jul 13, 2007 | Completed final sign-off Dec 2007 | 860 Waller St | work @ unit# 1 only. remodel bathroom, new toilet, new shower, new basin, new marble at shower, wiring, plumbing @ 1st floor, unit# 1.Details
work @ unit# 1 only. remodel bathroom, new toilet, new shower, new basin, new marble at shower, wiring, plumbing @ 1st floor, unit# 1. | $10,000 |
| Jun 17, 2004 | Completed final sign-off Nov 2004 | 800 Teresita Bl | r/r upper cabinets.install microwave hood fan combo. replace hood in kitchen.Details
r/r upper cabinets.install microwave hood fan combo. replace hood in kitchen. | $1,500 |
| Apr 22, 2004 | Completed final sign-off Aug 2004 | 800 Teresita Bl | install one window into existing framing & jams in one bedroom, install one anderson door into existDetails
install one window into existing framing & jams in one bedroom, install one anderson door into exist | $3,500 |
| Mar 5, 2004 | Completed final sign-off May 2004 | 860 Waller St | #3- remove all (e)cabinets,replace w/new cabinets same location,new countertop & back splash,Details
#3- remove all (e)cabinets,replace w/new cabinets same location,new countertop & back splash, | $16,800 |
| Aug 14, 2003 | Completed final sign-off Nov 2003 | 420 Somerset St | install new kitchen cabinets same location 4 upper cabinets 4 lower cabinets new counter top 13Details
install new kitchen cabinets same location 4 upper cabinets 4 lower cabinets new counter top 13 | $9,000 |
| May 29, 2003 | Completed final sign-off Apr 2004 | 1565 Noe St | construct (n) concrete retaining wall in rear yard to support (e) wood retaining wallDetails
construct (n) concrete retaining wall in rear yard to support (e) wood retaining wall | $3,000 |
| Apr 25, 2003 | Completed final sign-off Jun 2003 | 57 Turquoise Wy | remodel 1 bathroom, remove tile, shower walls and floor, install new shower pan, new vanity cabinetDetails
remodel 1 bathroom, remove tile, shower walls and floor, install new shower pan, new vanity cabinet | $8,900 |
| Oct 9, 2002 | Completed final sign-off Dec 2002 | 1565 Noe St | remodel ex planter in front yard replace wood fence at side prop line, with short wall. create stairDetails
remodel ex planter in front yard replace wood fence at side prop line, with short wall. create stair | $3,000 |
| Dec 14, 2001 | Completed final sign-off Sep 2002 | 69 Sequoia Wy | add room @rear of garage area & new bathroom, remove 1 post at center wall, new window, insulate winDetails
add room @rear of garage area & new bathroom, remove 1 post at center wall, new window, insulate win | $28,000 |
| Apr 26, 2001 | Completed final sign-off Sep 2001 | 395 Rolph St | intall new room back of garage area 25x19 new wood flr over cncrte slab new wall @ cntr beam/new walDetails
intall new room back of garage area 25x19 new wood flr over cncrte slab new wall @ cntr beam/new wal | $12,000 |
| Apr 18, 2001 | Completed final sign-off Oct 2001 | 395 Rolph St | remove all (e) kitchen cabinets and replace with new cabinets, new counter tops, new ovenDetails
remove all (e) kitchen cabinets and replace with new cabinets, new counter tops, new oven | $40,000 |
| Feb 6, 2001 | Completed final sign-off Apr 2001 | 172 College Av | remodel kitchen,new cabinets,new gas range,existing location,new counter tops & backsplash. new flooDetails
remodel kitchen,new cabinets,new gas range,existing location,new counter tops & backsplash. new floo | $8,400 |
| Aug 4, 2000 | Completed final sign-off Feb 2001 | 619 Teresita Bl | remodel kitchen & bathroom, new cabinets,appliances, countertops,tub, toilet,tile on wallsDetails
remodel kitchen & bathroom, new cabinets,appliances, countertops,tub, toilet,tile on walls | $15,000 |
| Jan 4, 2000 | Expired or cancelled expired Jul 2000 | 160 Parker Av | remodel existing kitchen,new cabinets,new countertops,backsplash,new flooring,new dsihwasherDetails
remodel existing kitchen,new cabinets,new countertops,backsplash,new flooring,new dsihwasher | $10,000 |