Deacon Construction Llc
- Based in
- Citrus Heights
- On San Francisco permits
- Dec 2016 to Jun 2025
- Last 24 months
- 1 permit filed
7 permits since 2000: 5 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 755 days from filing to permit and 918 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 21, 2016 | Completed final sign-off Jul 2021 | 550 07th St | remove 2nd story structure, bldg facades on 7th & langton st ceilings, floors non loading walls, work including 2nd story, mezzanine, facades, entries, glazing, clading, elevator,, stairs, mep, restrms, finishes. t.i. work to be addressed in future permit. ** maher: yes. route to dph **Details
remove 2nd story structure, bldg facades on 7th & langton st ceilings, floors non loading walls, work including 2nd story, mezzanine, facades, entries, glazing, clading, elevator,, stairs, mep, restrms, finishes. t.i. work to be addressed in future permit. ** maher: yes. route to dph ** | $4,900,000 |