Back to kitchen remodel contractors
De Well Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2001 to Feb 2007
- Last 24 months
- 0 permits filed
25 permits since 2000: 19 completed, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 9 completed. Typically 0 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 24, 2006 | Completed final sign-off Jan 2008 | 61 Twin Peaks Bl | interior remodeling, remodel (e) kitchen, remodel (e) 3 bathrooms. replace (e) windows in front & rear. replace (e) siding with stucco to match adj. building.Details
interior remodeling, remodel (e) kitchen, remodel (e) 3 bathrooms. replace (e) windows in front & rear. replace (e) siding with stucco to match adj. building. | $100,000 |
| Jan 23, 2006 | Completed final sign-off Jun 2006 | 87 Sylvan Dr | add new bedroom, family room, laundry room and bathroom at ground floor.remodel kitchen-replace cabinet, floor tile, counter w/ cabinet & dining counter and remodel bathroom at the upper floor.Details
add new bedroom, family room, laundry room and bathroom at ground floor.remodel kitchen-replace cabinet, floor tile, counter w/ cabinet & dining counter and remodel bathroom at the upper floor. | $25,000 |
| Nov 28, 2005 | Completed final sign-off Sep 2006 | 2242 17th Av | add new bedroom, bathroom, laundry area at the ground floor and storage room.remodel kitchen - change cabinet, floorings.reconfigure bathrooms. add new bathrom for master bedroom. add new closets for both bedrooms with new french door in the master bedroom upper floor.Details
add new bedroom, bathroom, laundry area at the ground floor and storage room.remodel kitchen - change cabinet, floorings.reconfigure bathrooms. add new bathrom for master bedroom. add new closets for both bedrooms with new french door in the master bedroom upper floor. | $45,000 |
| Aug 29, 2005 | Completed final sign-off Nov 2005 | 84 Navajo Av | remodel (1) bathroom & kitchen (upstairs)Details
remodel (1) bathroom & kitchen (upstairs) | $15,000 |
| Jun 30, 2005 | Completed final sign-off Oct 2005 | 2683 39th Av | replace kitchen cabinets and countertop, sink - non-structural workDetails
replace kitchen cabinets and countertop, sink - non-structural work | $9,000 |
| Jun 1, 2005 | Completed final sign-off Dec 2005 | 2200 Sacramento St | non structural work, replace kitchen cabs & countertop in same placeDetails
non structural work, replace kitchen cabs & countertop in same place | $6,000 |
| Jan 19, 2005 | Completed final sign-off Mar 2005 | 1953 Grove St | remodel bathroom & kitchen, flooring.Details
remodel bathroom & kitchen, flooring. | $15,000 |
| Dec 29, 2004 | Completed final sign-off Apr 2005 | 32 Topaz Wy | replace wall & fl granic tile, remodel kitchen, replace bathrooms tile & toilets.Details
replace wall & fl granic tile, remodel kitchen, replace bathrooms tile & toilets. | $13,000 |
| Oct 20, 2004 | Completed final sign-off Mar 2005 | 890 Junipero Serra Bl | no structural work- remodel (e) grnd flr bathrm, replace (e) kitchen cabs, countertop on 1st flr, reDetails
no structural work- remodel (e) grnd flr bathrm, replace (e) kitchen cabs, countertop on 1st flr, re | $30,000 |