Daylight Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2001 to Dec 2025
- Last 24 months
- 3 permits filed
24 permits since 2000: 20 completed, 2 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 in progress. Typically 219 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 2, 2025 | In progress issued Jul 2026 | 137 Chilton Av | convert 1/f and part of (e) garage to adu. the (e) 2/f will remain separate residential unit. no addition is proposed, all work to be within the footprint of (e) bldg. rear 2/f deck and portions of rear structure will be repaired and replaced inkind as required. new windows at 1/f.Details
convert 1/f and part of (e) garage to adu. the (e) 2/f will remain separate residential unit. no addition is proposed, all work to be within the footprint of (e) bldg. rear 2/f deck and portions of rear structure will be repaired and replaced inkind as required. new windows at 1/f. | $125,000 |