Daylight Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2001 to Dec 2025
- Last 24 months
- 3 permits filed
24 permits since 2000: 20 completed, 2 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 10 completed. Typically 1 days from filing to permit and 115 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 4, 2024 | Completed final sign-off Oct 2024 | 142 Ashton Av | g/f: to comply with nov 202315358 (work without permit). to remove unwarranted bathroom and interior walls at lower level.Details
g/f: to comply with nov 202315358 (work without permit). to remove unwarranted bathroom and interior walls at lower level. | $1,000 |
| Jul 6, 2023 | Completed final sign-off Nov 2023 | 315 Chenery St | revision to pa#202305258548. remodel (e) attac space. add bathroom at attic front bedroomDetails
revision to pa#202305258548. remodel (e) attac space. add bathroom at attic front bedroom | |
| Nov 29, 2022 | Completed final sign-off Feb 2023 | 81 Santa Rosa Av | add bathroom (toilet, sink, tub) to existing ground level rumpus roomDetails
add bathroom (toilet, sink, tub) to existing ground level rumpus room | $18,000 |
| Dec 27, 2021 | Completed final sign-off Aug 2022 | 146 Ashton Av | remodel exising sfd. convert existing space into bedrooms and bathrooms. add ceiling light fixtures. replace and relocate exising water heater and furnace.Details
remodel exising sfd. convert existing space into bedrooms and bathrooms. add ceiling light fixtures. replace and relocate exising water heater and furnace. | $38,000 |
| Dec 21, 2020 | Completed final sign-off Mar 2022 | 342 Chenery St | remove all fixtures, including the bathtub. remove gile from the floor and around the bathtub. sheet rock on walls & ceiling to remain. update the plumbing pipes. tile around bathtub & the floor. install new vanity cabinet and fixtures. paint bathroom.Details
remove all fixtures, including the bathtub. remove gile from the floor and around the bathtub. sheet rock on walls & ceiling to remain. update the plumbing pipes. tile around bathtub & the floor. install new vanity cabinet and fixtures. paint bathroom. | $8,500 |
| Mar 11, 2020 | Completed final sign-off Oct 2020 | 1 Roanoke St | bathroom remodel at 2nd fl. remove/replace plaster & lath from walls and ceiling in bath. replace toilet, tub, sink. replace tile in bath. update plumbing and electricalDetails
bathroom remodel at 2nd fl. remove/replace plaster & lath from walls and ceiling in bath. replace toilet, tub, sink. replace tile in bath. update plumbing and electrical | $15,000 |
| Nov 16, 2018 | Completed final sign-off Dec 2018 | 44 College Av | demo interior of bathroom. pocket door wall to remain. upgrade plumbing and electrical. remove bathtub and install new shower stall. install insulation in walls and ceiling. install (4) can lights in ceiling and one fan. sheetrock walls. tile shower enclosure and floor. paint bathroom.Details
demo interior of bathroom. pocket door wall to remain. upgrade plumbing and electrical. remove bathtub and install new shower stall. install insulation in walls and ceiling. install (4) can lights in ceiling and one fan. sheetrock walls. tile shower enclosure and floor. paint bathroom. | $15,500 |
| Oct 3, 2017 | Completed final sign-off Nov 2017 | 50 Hearst Av | remove lath/plaster/sheetrock from interior of bathroom. update plumbing and electrical. replace bathtub/vanity sink, new tile around tub and on the floor. new paint. all work in bathroom. no change to walls, doors, or openingsDetails
remove lath/plaster/sheetrock from interior of bathroom. update plumbing and electrical. replace bathtub/vanity sink, new tile around tub and on the floor. new paint. all work in bathroom. no change to walls, doors, or openings | $10,500 |
| Apr 20, 2017 | Completed final sign-off Jul 2017 | 410 Foerster St | installation of full bath on 2nd fl at existing entry foyer area, demo and installation of new cabinets in kitchenDetails
installation of full bath on 2nd fl at existing entry foyer area, demo and installation of new cabinets in kitchen | $24,600 |
| May 21, 2014 | Completed final sign-off Sep 2022 | 342 Chenery St | excavate for new ground floor (basement), add one car garage under building change existing storage on 1st floor to master bedroom, relocate front stair, add new bathroom to 3rd floorDetails
excavate for new ground floor (basement), add one car garage under building change existing storage on 1st floor to master bedroom, relocate front stair, add new bathroom to 3rd floor | $70,000 |