Back to kitchen remodel contractors
Davies Construction
- Based in
- Pacifica
- On San Francisco permits
- Feb 2011 to Apr 2013
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 178 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 5, 2012 | Completed final sign-off Jul 2013 | 2109 Steiner St | revision to pa #2011.04.11.3826: remove two windows for moment frame, rearrange bathroom & master bathroom, reduce kitchen island.Details
revision to pa #2011.04.11.3826: remove two windows for moment frame, rearrange bathroom & master bathroom, reduce kitchen island. | $2,000 |
| Aug 26, 2011 | Completed final sign-off Mar 2012 | 1314 Shotwell St | renovation of single family home includes kitchen replacement, addition of 1 window and removal of one door on the 1st level. on 2nd level reconfiguration of an extg bedroom. addition of 1 bathroom and laundry closet and addition of 2 skylights. replace 5 exg windows.Details
renovation of single family home includes kitchen replacement, addition of 1 window and removal of one door on the 1st level. on 2nd level reconfiguration of an extg bedroom. addition of 1 bathroom and laundry closet and addition of 2 skylights. replace 5 exg windows. | $110,000 |
| Jun 15, 2011 | Completed final sign-off Aug 2011 | 250 10th St | revision to pa# 2011.02.09.9912 and 2011.03.21.2432. delete reception, lighting, kitchenete cabinets, urinal, and diaper change sink. replace urinal with toilet.Details
revision to pa# 2011.02.09.9912 and 2011.03.21.2432. delete reception, lighting, kitchenete cabinets, urinal, and diaper change sink. replace urinal with toilet. | |
| Mar 21, 2011 | Completed final sign-off Aug 2011 | 250 10th St | revision to app#201102099912. add kitchenette to office #6,delete floor outlets, delete 2 toilets from children's toilet #09 and replace with one urinal and 1 delete sink at class room #07Details
revision to app#201102099912. add kitchenette to office #6,delete floor outlets, delete 2 toilets from children's toilet #09 and replace with one urinal and 1 delete sink at class room #07 | $2,200 |