David Ruechelle
- Based in
- San Francisco
- On San Francisco permits
- May 2004 to Jun 2020
- Last 24 months
- 0 permits filed
66 permits since 2000: 59 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
6 deck permits: 5 completed, 1 never finaled. Typically 0 days from filing to permit and 43 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 2, 2012 | Completed final sign-off May 2012 | 65 Stanford Heights Av | repair existing deck, less than 50%. add 4x6 beam (pt). a35 connectors, 2x6 cross bracing to (e) posts with simpson connectors.Details
repair existing deck, less than 50%. add 4x6 beam (pt). a35 connectors, 2x6 cross bracing to (e) posts with simpson connectors. | $1,500 |
| Feb 11, 2009 | Never finaled issued Feb 2009, no final | 429 Burnett Av | exterior wood deck and stairs repair. in kind on exactly same foot print. decorative freestanding trellis, north edge of the house not visible from street.Details
exterior wood deck and stairs repair. in kind on exactly same foot print. decorative freestanding trellis, north edge of the house not visible from street. | $32,000 |
| Sep 24, 2008 | Completed final sign-off Sep 2008 | 3147 Folsom St | revise pa 200807166815, for 10 linear feet of rear footing adjacent to new deck work, remove dry rotted sill and framing below grade.connect rebar to extg foundation,cap foundation to raise above grade. bldg new foundation sill and framing. all per stamped engineer's plan. refer to pa 200807166815Details
revise pa 200807166815, for 10 linear feet of rear footing adjacent to new deck work, remove dry rotted sill and framing below grade.connect rebar to extg foundation,cap foundation to raise above grade. bldg new foundation sill and framing. all per stamped engineer's plan. refer to pa 200807166815 | $1,180 |
| Feb 25, 2008 | Completed final sign-off Apr 2008 | 815 York St | replace existing landing and stairs from back door, ground level deck attached to landing/stairs., 30 inches from grade.Details
replace existing landing and stairs from back door, ground level deck attached to landing/stairs., 30 inches from grade. | $19,700 |
| Jun 30, 2006 | Completed final sign-off Dec 2006 | 156 Midcrest Wy | add second level deck at rear, no more than 9 1/2 ft above grade with 3' railing. replace wndw with door on rear facade. remove one electrical outlet.Details
add second level deck at rear, no more than 9 1/2 ft above grade with 3' railing. replace wndw with door on rear facade. remove one electrical outlet. | $13,500 |
| Jan 26, 2006 | Completed final sign-off Mar 2006 | 156 Midcrest Wy | removal of existing outdoor ground level deck. replace with new deckDetails
removal of existing outdoor ground level deck. replace with new deck | $19,225 |