Back to bathroom remodel contractors
David Ruechelle
- Based in
- San Francisco
- On San Francisco permits
- May 2004 to Jun 2020
- Last 24 months
- 0 permits filed
66 permits since 2000: 59 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
26 bathroom remodel permits: 23 completed, 3 never finaled. Typically 0 days from filing to permit and 135 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2020 | Completed final sign-off Nov 2020 | 727 11th Av | (1) bath remodel, 95 sq. ft.; all new plumbing fixtures including vanity, basins, faucets, tub, toilet, new shower stall. new electrical and plumbing including shower pan. new insert window, new interior door, new exhaust fan and solar light tubes. no wall modifications.Details
(1) bath remodel, 95 sq. ft.; all new plumbing fixtures including vanity, basins, faucets, tub, toilet, new shower stall. new electrical and plumbing including shower pan. new insert window, new interior door, new exhaust fan and solar light tubes. no wall modifications. | $93,000 |
| Nov 1, 2019 | Completed final sign-off Jul 2020 | 3857 23rd St | remodel of half bath 15 sf and full bath 70 sf, updates to plumbing and electrical. no changes to bearing walls, no structural work.Details
remodel of half bath 15 sf and full bath 70 sf, updates to plumbing and electrical. no changes to bearing walls, no structural work. | $118,000 |
| Sep 23, 2019 | Completed final sign-off Jun 2020 | 300 Beale St | unit 408 - remodel kitchen, master bath and half bath. update electrical and plumbing accordingly, new cabinetry, plumbing and electrical fixturesDetails
unit 408 - remodel kitchen, master bath and half bath. update electrical and plumbing accordingly, new cabinetry, plumbing and electrical fixtures | $180,000 |
| Jul 19, 2019 | Completed final sign-off Nov 2019 | 730 Grand View Av | bath remodel. replace toilet, sink, remove tub and build shower stall. new insert window. window is not street facing. rear facing, no property lineDetails
bath remodel. replace toilet, sink, remove tub and build shower stall. new insert window. window is not street facing. rear facing, no property line | $33,000 |
| Nov 7, 2018 | Completed final sign-off Mar 2019 | 34 Yukon St | kitchen & bath remodel. new wall board & ceilings w/ insulation. new cabinets & fixts for both. fire insert replacement windows. in-kind.Details
kitchen & bath remodel. new wall board & ceilings w/ insulation. new cabinets & fixts for both. fire insert replacement windows. in-kind. | $120,000 |
| Jul 6, 2018 | Completed final sign-off Nov 2018 | 300 Beale St | #302 -bath remodel, shower stall with shower pan inspection, vanity,tile,toilet, basins, exhaust fan, & led lightingsDetails
#302 -bath remodel, shower stall with shower pan inspection, vanity,tile,toilet, basins, exhaust fan, & led lightings | $65,500 |
| Jun 4, 2018 | Completed final sign-off Feb 2019 | 945 Corbett Av | unit 107: remodel (e) bath, new plumbing, electrical, walls flooring, cabinets, fixtures, removal of pocket door, seperate gas meter to be provided by pg&e; new line to service gas appliance.Details
unit 107: remodel (e) bath, new plumbing, electrical, walls flooring, cabinets, fixtures, removal of pocket door, seperate gas meter to be provided by pg&e; new line to service gas appliance. | $82,000 |
| Feb 13, 2018 | Completed final sign-off Sep 2018 | 293 Cumberland St | bath remodel - new lighting, plumbing (toilet, vanity, sinks, shower stall with pan insepctions), new wall board, type x, tile.Details
bath remodel - new lighting, plumbing (toilet, vanity, sinks, shower stall with pan insepctions), new wall board, type x, tile. | $85,000 |
| May 31, 2017 | Completed final sign-off Sep 2017 | 601 04th St | bathroom remodel: new plumbing fixtures, sinks, tub, faucet, toilet. new cabinets, tile. electrical and plumbing permits pulled by electrical and plumbing sub contractors.Details
bathroom remodel: new plumbing fixtures, sinks, tub, faucet, toilet. new cabinets, tile. electrical and plumbing permits pulled by electrical and plumbing sub contractors. | $38,000 |
| May 24, 2017 | Completed final sign-off Oct 2017 | 1729 Pierce St | ground fl: interior remodel, bathroom, kitchen, and closet. new slab countertop and back splash. relocate washer/dryer. (n) french doors and window in living rm to courtyard, in-kind.Details
ground fl: interior remodel, bathroom, kitchen, and closet. new slab countertop and back splash. relocate washer/dryer. (n) french doors and window in living rm to courtyard, in-kind. | $142,000 |
| Feb 7, 2017 | Completed final sign-off Jun 2017 | 1101 Green St | unit 203: bathroom remodel; replace tub, vanity,sink, faucets, tile.Details
unit 203: bathroom remodel; replace tub, vanity,sink, faucets, tile. | $49,100 |
| May 3, 2016 | Never finaled issued Jul 2017, no final | 235 Clinton Pk | grd fl: legalization of (e) unauthorized dwelling unit under ordinance no. 43-14. legalization of (e) studio apartment with kitchen & full bath. sprinkler deferred.Details
grd fl: legalization of (e) unauthorized dwelling unit under ordinance no. 43-14. legalization of (e) studio apartment with kitchen & full bath. sprinkler deferred. | $11,700 |
| Apr 10, 2015 | Completed final sign-off Oct 2015 | 377 Hermann St | remove bearing wall between kitchen & dining room. provide new beam & new post. remodel kitchen & bath. replace iwndow @ 2nd floor rear yard. add half bathroom.Details
remove bearing wall between kitchen & dining room. provide new beam & new post. remodel kitchen & bath. replace iwndow @ 2nd floor rear yard. add half bathroom. | $10,000 |
| Mar 26, 2015 | Completed final sign-off Jun 2015 | 192 Noe St | demo (e) bath, add new tile, shower cabinetry faucets, and basin with updated lighting & outlet to code ,update plumbing new led lighting replace exhaust fan use (e) ducting no walls to be removed /no structuralDetails
demo (e) bath, add new tile, shower cabinetry faucets, and basin with updated lighting & outlet to code ,update plumbing new led lighting replace exhaust fan use (e) ducting no walls to be removed /no structural | $45,000 |
| Apr 9, 2014 | Completed final sign-off Mar 2015 | 164 Midcrest Wy | bathroom remodel, replace fixtures, tile, insulate r-13 exterior walls, r-19 ceiling,5/8 type x wall bound throughout. no change on wallsDetails
bathroom remodel, replace fixtures, tile, insulate r-13 exterior walls, r-19 ceiling,5/8 type x wall bound throughout. no change on walls | $20,000 |
| Jun 21, 2013 | Completed final sign-off Mar 2014 | 1454 Kearny St | remove existing non bearing wall add a new toilet, relocate w/d to ground level scope of work on 1456 kearney, remove (e) non-bearing wall - relocate (e) repurposed closets, add new closet in bedroom & bathroomDetails
remove existing non bearing wall add a new toilet, relocate w/d to ground level scope of work on 1456 kearney, remove (e) non-bearing wall - relocate (e) repurposed closets, add new closet in bedroom & bathroom | $1,000 |
| Jun 6, 2013 | Completed final sign-off Oct 2013 | 49 Pond St | revision to pa #2013.03.26.3013 - hang additional type x 5/8" wall board on ceilings with new joists (kitchen & 2 baths) for total of (2) two layers. (per notes of main job card made upon approval of rough framing / ok to cover) @ bath & kitchen area.Details
revision to pa #2013.03.26.3013 - hang additional type x 5/8" wall board on ceilings with new joists (kitchen & 2 baths) for total of (2) two layers. (per notes of main job card made upon approval of rough framing / ok to cover) @ bath & kitchen area. | $500 |
| Mar 26, 2013 | Completed final sign-off Oct 2013 | 49 Pond St | remove and relocate interior walls at the second level. remove and replace new windows at second floor rear of the bldg.provide lateral support at rear wall at 1st and second floors as required. add full bath under stairs and closet.Details
remove and relocate interior walls at the second level. remove and replace new windows at second floor rear of the bldg.provide lateral support at rear wall at 1st and second floors as required. add full bath under stairs and closet. | $35,000 |
| Mar 19, 2013 | Completed final sign-off Oct 2013 | 75 Skyview Wy | bathroom remodel, replacement of wall finishes, r-3 insulation and type x wallboard on exterior. replacement of tile, vanity toilet, tub, shower stall.Details
bathroom remodel, replacement of wall finishes, r-3 insulation and type x wallboard on exterior. replacement of tile, vanity toilet, tub, shower stall. | $31,000 |
| Nov 8, 2012 | Completed final sign-off Jan 2013 | 726 Tennessee St | bathroom remodel, new tub, vanity, sink, plumbing and electrical updates, new tile, no removal of any wall ; lighting must comply with cec 150(k)Details
bathroom remodel, new tub, vanity, sink, plumbing and electrical updates, new tile, no removal of any wall ; lighting must comply with cec 150(k) | $24,000 |
| Aug 28, 2012 | Completed final sign-off Nov 2012 | 235 Clinton Pk | remodel kitchen and bath for rental unit. removal of walls to studs, updates of plumbing and electrical. insulate exterior walls r-13. kitchen approx. 250 sq. ft. bath size approx. 75 sq. ft. lighting must comply with cec 150 (k)Details
remodel kitchen and bath for rental unit. removal of walls to studs, updates of plumbing and electrical. insulate exterior walls r-13. kitchen approx. 250 sq. ft. bath size approx. 75 sq. ft. lighting must comply with cec 150 (k) | $43,145 |
| Jul 30, 2012 | Completed final sign-off Oct 2012 | 71 Ord St | demo extg bath, install new tub and vanity. add wet room shower head in extg tub area/room.Details
demo extg bath, install new tub and vanity. add wet room shower head in extg tub area/room. | $30,000 |
| Jun 29, 2011 | Completed final sign-off Oct 2011 | 231 Clinton Pk | remodel of bath and wc. update electrical, adding lighting in lr,dr and 2 brs and hall. remove 2 windows, add 1 smaller window, not visible from street. r-19 insulation behind areas of wall and ceiling where wallboard are being replaced.Details
remodel of bath and wc. update electrical, adding lighting in lr,dr and 2 brs and hall. remove 2 windows, add 1 smaller window, not visible from street. r-19 insulation behind areas of wall and ceiling where wallboard are being replaced. | $60,000 |
| Dec 9, 2010 | Completed final sign-off Jun 2011 | 172 Panorama Dr | remodel kitchen and bath requiring alteration of 2 interior walls. additioin of larger window in kitchen. reroute plumbing for new room configurations. update elec to current code for both rooms. rerouting of venting/hvac ductsDetails
remodel kitchen and bath requiring alteration of 2 interior walls. additioin of larger window in kitchen. reroute plumbing for new room configurations. update elec to current code for both rooms. rerouting of venting/hvac ducts | $64,750 |
| Jan 25, 2007 | Never finaled issued Jan 2007, no final | 1320 Stevenson St | replace kitchen cabinets, counter tios 1 kitchens sink, kitchen faucet, replace ceiling lights, replace 1 bathroom facuet, replace range hood. all work within unit #c408. install flourescent or occupant sensor switch in kitchen to comply with title 24 energy.Details
replace kitchen cabinets, counter tios 1 kitchens sink, kitchen faucet, replace ceiling lights, replace 1 bathroom facuet, replace range hood. all work within unit #c408. install flourescent or occupant sensor switch in kitchen to comply with title 24 energy. | $9,000 |
| May 14, 2004 | Never finaled issued May 2004, no final | 164 Midcrest Wy | convert (e) bedroom and garage into new bedroom, remove (e) bathroom to enlarge (e) garageDetails
convert (e) bedroom and garage into new bedroom, remove (e) bathroom to enlarge (e) garage | $40,000 |