David Ramirez
- Based in
- San Francisco
- On San Francisco permits
- Dec 2008 to Mar 2025
- Last 24 months
- 1 permit filed
21 permits since 2000: 20 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 2 days from filing to permit and 207 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 27, 2018 | Completed final sign-off Jan 2019 | 598 28th St | remove (e) walls at kitchen are for kitchen remodel. remove (e) elevator & replace w/(n) stairs from upper to lower floor. remodel (e) bathrooms at upper floor.Details
remove (e) walls at kitchen are for kitchen remodel. remove (e) elevator & replace w/(n) stairs from upper to lower floor. remodel (e) bathrooms at upper floor. | $125,000 |