Back to kitchen remodel contractors
David Huynh
- Based in
- Oakland
- On San Francisco permits
- Oct 2008 to Dec 2014
- Last 24 months
- 0 permits filed
20 permits since 2000: 17 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 2 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 17, 2014 | Completed final sign-off Feb 2015 | 674 Broadway | install kitchen equipment and appliances, or replace or refurbish extg kitchen equipment per department of public health inspection report.Details
install kitchen equipment and appliances, or replace or refurbish extg kitchen equipment per department of public health inspection report. | $13,660 |
| Aug 13, 2012 | Completed final sign-off Oct 2012 | 648 Pacific Av | tenant improvement per requirement of health department to install grease trap, one comp. sink, handsink, and replace (e) lights in the kitchen. 20% upgrade expenditures @ existing unisex toilet facility. relocate h.c. lavatory.Details
tenant improvement per requirement of health department to install grease trap, one comp. sink, handsink, and replace (e) lights in the kitchen. 20% upgrade expenditures @ existing unisex toilet facility. relocate h.c. lavatory. | $12,000 |
| Jun 4, 2010 | Completed final sign-off Sep 2010 | 3321 17th St | bathroom & kitchen renovation, replace kitchen cabinet, countertop & sink. remove bathroom existing plaster, replace with 5/8 drywall & install insulation. existing branch circuit & outlets no change, replace switches & receptical only. no structural change.Details
bathroom & kitchen renovation, replace kitchen cabinet, countertop & sink. remove bathroom existing plaster, replace with 5/8 drywall & install insulation. existing branch circuit & outlets no change, replace switches & receptical only. no structural change. | $18,000 |
| Aug 21, 2009 | Completed final sign-off Feb 2010 | 400 Cordova St | interior remodeling: remodel (e) bath into 2 bathrooms; remodel (e) kitchen;, install smoke detector; change entrance to a bedroom all work done on the second floor. no exterior work.Details
interior remodeling: remodel (e) bath into 2 bathrooms; remodel (e) kitchen;, install smoke detector; change entrance to a bedroom all work done on the second floor. no exterior work. | $26,000 |