Darrel Denny Construction
- Based in
- Larkspur
- On San Francisco permits
- Nov 2012 to Jul 2019
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 66 days from filing to permit and 349 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 17, 2018 | Completed final sign-off Feb 2020 | 425 Dewey Bl | upstair remove (e) wall at breakfast nook remodel kitchen to include new cabs, topes, appliances, flooring, millwork plumbing, electrical, & radiant heating, downstairs: create new stairway down to lower level remove (e) lower level walls appliances, & finishes remodel lower level to includeDetails
upstair remove (e) wall at breakfast nook remodel kitchen to include new cabs, topes, appliances, flooring, millwork plumbing, electrical, & radiant heating, downstairs: create new stairway down to lower level remove (e) lower level walls appliances, & finishes remodel lower level to include | $50,000 |