Back to kitchen remodel contractors
Danziger Builders
- Based in
- Novato
- On San Francisco permits
- Sep 2015 to Apr 2026
- Last 24 months
- 6 permits filed
38 permits since 2000: 25 completed, 1 in progress, 9 never finaled, 3 expired or cancelled.
Of the 9 never-finaled permits, 4 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 42 days from filing to permit and 486 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2025 | Completed final sign-off Aug 2026 | 415 El Camino Del Mar | addition of elevator spanning all 3 floors. remodel of interior non structural walls and bathrooms. including remodel of kitchen finishes and fixtures.Details
addition of elevator spanning all 3 floors. remodel of interior non structural walls and bathrooms. including remodel of kitchen finishes and fixtures. | $150,000 |
| Jul 31, 2024 | Completed final sign-off Sep 2025 | 1170 Sacramento St | unit 10d: relocate select non structural walls. relocated 2 baths, remove 1 powder rm. replace all light fixture, add outlets, replace circuits brealer box w/code complaimte. replace all plumbing fixtures & applicances. new cabinets & fisnies & doors. kitchen remodel. no exterior work &life safety &Details
unit 10d: relocate select non structural walls. relocated 2 baths, remove 1 powder rm. replace all light fixture, add outlets, replace circuits brealer box w/code complaimte. replace all plumbing fixtures & applicances. new cabinets & fisnies & doors. kitchen remodel. no exterior work &life safety & | $450,000 |
| Sep 30, 2020 | Completed final sign-off Sep 2023 | 945 Green St | unit 10: work to (e) full floor on 11/f: remodel (e) kitchen, master suite, 3 bedrooms, and laundry room.Details
unit 10: work to (e) full floor on 11/f: remodel (e) kitchen, master suite, 3 bedrooms, and laundry room. | $194,589 |
| Nov 16, 2017 | Completed final sign-off Jan 2019 | 2420 Larkin St | 1)replace extg kitchen cabinets and extg appliances with new kitchen cabinets and new appliances. 2)replace extg incandescent lighting with new led lighting.Details
1)replace extg kitchen cabinets and extg appliances with new kitchen cabinets and new appliances. 2)replace extg incandescent lighting with new led lighting. | $31,800 |