Daniel Miller
- Based in
- Pacifica
- On San Francisco permits
- Sep 2006 to Apr 2014
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 0 days from filing to permit and 124 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 15, 2014 | Completed final sign-off Mar 2015 | 183 Hancock St | demolish deck and dropped ceilig at upper unit. renovate kitchen and bath in uper unit and add new internal stair to e lower level office. add 2 skylights, and 2 new doors to new upper unit deck. renovate lower unit to create legal bath, install 1 new doors, 2 new deck windows. new fence. relaceDetails
demolish deck and dropped ceilig at upper unit. renovate kitchen and bath in uper unit and add new internal stair to e lower level office. add 2 skylights, and 2 new doors to new upper unit deck. renovate lower unit to create legal bath, install 1 new doors, 2 new deck windows. new fence. relace | $235,000 |
| Dec 7, 2010 | Completed final sign-off Jan 2011 | 174 Guerrero St | dry rot repair of side exterior stairs, less than 50% of the stairs being replaced, same for sameDetails
dry rot repair of side exterior stairs, less than 50% of the stairs being replaced, same for same | $500 |
| Sep 27, 2006 | Completed final sign-off Jan 2007 | 1913 Grant Av | dryrot replacement of back stairs as needed. landings, stringers, treads and risers. approx 100 ft less than 50% of stair way.Details
dryrot replacement of back stairs as needed. landings, stringers, treads and risers. approx 100 ft less than 50% of stair way. | $2,000 |