Permit GraphShortlistSan Francisco building permits since 2000

Daniel Larsen Builders

Contractor license
471439
State license record
Based in
Alameda
On San Francisco permits
Mar 2000 to Jun 2026
Last 24 months
1 permit filed

95 permits since 2000: 80 completed, 9 never finaled, 6 expired or cancelled.

Of the 9 never-finaled permits, 1 is 5 to 10 years old, 8 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllRoof deck 1Deck 2Stairs 4Kitchen remodel 30Bathroom remodel 27

4 stairs permits: 4 completed. Typically 72 days from filing to permit and 595 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Aug 8, 2023Completed
final sign-off Apr 2025
3750 Clay Strepair and resurface (e) stairs. relocate bottom run of concrete stairs. replace (e) front fence. add gate. replace roof deck rail.
Details
Permit
202308083936
Status
complete
Filed
Aug 8, 2023
Permit issued
Apr 1, 2024
Final sign-off
Apr 11, 2025
Declared cost
$30,000
Address
3750 Clay St

repair and resurface (e) stairs. relocate bottom run of concrete stairs. replace (e) front fence. add gate. replace roof deck rail.

Open the permit page

$30,000
Feb 17, 2015Completed
final sign-off Jul 2017
22 07th Avrevision to 201410027965. revise stairs and patio layouts and revise window at rear of 1st flr. answer to nov no 201522531
Details
Permit
201502178513
Status
complete
Filed
Feb 17, 2015
Permit issued
May 8, 2015
Final sign-off
Jul 31, 2017
Declared cost
$10,000
Address
22 07th Av

revision to 201410027965. revise stairs and patio layouts and revise window at rear of 1st flr. answer to nov no 201522531

Open the permit page

$10,000
Oct 2, 2014Completed
final sign-off Jul 2017
22 07th Avaddition of 146 sq ft @ 1st level below extg structure, renovate 680 sq ft storage area, relocate int. stairs, new egress stairs at rear yard, replace windows at 2nd and 3rd level rear of structure, excavation to be 41 cubic yards or less, excavation < 4 ft below extg grade. rev.appl. 2014072426.
Details
Permit
201410027965
Status
complete
Filed
Oct 2, 2014
Permit issued
Dec 5, 2014
Final sign-off
Jul 28, 2017
Declared cost
$75,000
Address
22 07th Av

addition of 146 sq ft @ 1st level below extg structure, renovate 680 sq ft storage area, relocate int. stairs, new egress stairs at rear yard, replace windows at 2nd and 3rd level rear of structure, excavation to be 41 cubic yards or less, excavation < 4 ft below extg grade. rev.appl. 2014072426.

Open the permit page

$75,000
Nov 6, 2013Completed
final sign-off Dec 2013
426 Alvarado Strepair dryrot on front stairs treads less than 50%, install new concret bottom step to replace existing wood step comply with 2010 sf building code. no change to existing structure
Details
Permit
201311061239
Status
complete
Filed
Nov 6, 2013
Permit issued
Nov 6, 2013
Final sign-off
Dec 9, 2013
Declared cost
$2,000
Address
426 Alvarado St

repair dryrot on front stairs treads less than 50%, install new concret bottom step to replace existing wood step comply with 2010 sf building code. no change to existing structure

Open the permit page

$2,000