Back to bathroom remodel contractors
Daniel Knight Construction
- Based in
- Pine Grove
- On San Francisco permits
- May 2014 to Nov 2021
- Last 24 months
- 0 permits filed
12 permits since 2000: 8 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 1 never finaled, 1 expired or cancelled. Typically 6 days from filing to permit and 98 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 9, 2021 | Completed final sign-off Dec 2021 | 1205 Hyde St | apt #8: at 1 kitchen: new counter tops with new electrical layout at back splash with extg #2 electrical circuits. at 1 bathroom: new vanity, toilet and bath tub. all in extg locations. at unit: all new floors, baseboard, crown, tile shower, tile kitchen and bathroom floor, paint, new led lightDetails
apt #8: at 1 kitchen: new counter tops with new electrical layout at back splash with extg #2 electrical circuits. at 1 bathroom: new vanity, toilet and bath tub. all in extg locations. at unit: all new floors, baseboard, crown, tile shower, tile kitchen and bathroom floor, paint, new led light | $30,000 |
| Aug 20, 2021 | Completed final sign-off Sep 2021 | 1205 Hyde St | unit# 4-new bathtub & tile, vanity & toilet, tile floors @ bath & kitchen. new led lights & decora style plugs & switches thous out unit. new quariz counter top on (e) cabinets, new laminate floors paint, crown moulding & base roards. lights per cec 150.0 (k)Details
unit# 4-new bathtub & tile, vanity & toilet, tile floors @ bath & kitchen. new led lights & decora style plugs & switches thous out unit. new quariz counter top on (e) cabinets, new laminate floors paint, crown moulding & base roards. lights per cec 150.0 (k) | $25,000 |
| Apr 15, 2021 | Completed final sign-off Jul 2021 | 1205 Hyde St | unit renovation new 1 kitchen counter tops. at 1 bathroom new tub, vanity, toilet new tile floors at kitchen and bath. new electrical plugs and switch & light & bathroom exaust fan. replace window in kind.Details
unit renovation new 1 kitchen counter tops. at 1 bathroom new tub, vanity, toilet new tile floors at kitchen and bath. new electrical plugs and switch & light & bathroom exaust fan. replace window in kind. | $35,000 |
| Aug 6, 2019 | Completed final sign-off Nov 2019 | 2575 Washington St | apt 4: renovation of kitchen (new cabinets, new location for sink,stove, fridge) & bathroom (new fixtures, same location, toilet, sink, tub), add a laundry dryer vent to outside w/ bdd.Details
apt 4: renovation of kitchen (new cabinets, new location for sink,stove, fridge) & bathroom (new fixtures, same location, toilet, sink, tub), add a laundry dryer vent to outside w/ bdd. | $25,000 |
| Jun 25, 2019 | Completed final sign-off Aug 2020 | 2734 20th St | replace all windows in kind, new skylights, modify tenant walls, new apartment doors, new heating, new lighting and electrical outlets. remove old stairs. remove 2 bathrooms, install 3 new bathrooms. remodel 2 kitchensDetails
replace all windows in kind, new skylights, modify tenant walls, new apartment doors, new heating, new lighting and electrical outlets. remove old stairs. remove 2 bathrooms, install 3 new bathrooms. remodel 2 kitchens | $100,000 |
| Jun 14, 2019 | Completed final sign-off Aug 2020 | 126 Shotwell St | front building - interior renovation of 2 units in 2 story apartment building. new kitchen and bath in bath in each unit. surface finish improvements only in all other areasDetails
front building - interior renovation of 2 units in 2 story apartment building. new kitchen and bath in bath in each unit. surface finish improvements only in all other areas | $75,000 |
| Aug 8, 2018 | Never finaled issued Sep 2018, no final | 355 Laguna St | remove wall in the 3rd floor. add 1 new bathroom at 3rd flrDetails
remove wall in the 3rd floor. add 1 new bathroom at 3rd flr | $15,000 |
| Sep 29, 2014 | Expired or cancelled cancelled Jun 2019 | 2355 Bay St | unit #3: interior remodel to convert 2 bedroom layout, additon of one bathroom and no change to unit size. remodel kitchen and (e) bathroom. maher n/a.Details
unit #3: interior remodel to convert 2 bedroom layout, additon of one bathroom and no change to unit size. remodel kitchen and (e) bathroom. maher n/a. | $35,000 |