Back to kitchen remodel contractors
Daniel Awand Build And Design
- Based in
- San Francisco
- On San Francisco permits
- Feb 2013 to Jul 2025
- Last 24 months
- 1 permit filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 4 days from filing to permit and 167 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 2, 2025 | Completed final sign-off Dec 2025 | 2953 Pacific Av | interior renovation of e) kitchen & bathroom within e) residential unit. no structural changes or relocation of plumbingDetails
interior renovation of e) kitchen & bathroom within e) residential unit. no structural changes or relocation of plumbing | $50,000 |
| Feb 16, 2022 | Completed final sign-off Jan 2023 | 106 Peralta Av | kitchen remodel. remove and replace existing cabinetry and fixtures. bathroom remdel. replace existing vanity, sink, and faucet. exisiting tub to remain. re-tile shower walls. install bath fan. upgrade existing circuits in ktichen and bath in compliance with sf bldg requirements.Details
kitchen remodel. remove and replace existing cabinetry and fixtures. bathroom remdel. replace existing vanity, sink, and faucet. exisiting tub to remain. re-tile shower walls. install bath fan. upgrade existing circuits in ktichen and bath in compliance with sf bldg requirements. | $88,000 |
| May 3, 2013 | Completed final sign-off Aug 2013 | 147 Graystone Tr | remove non load bearing wall between kitchen & dining room. relocate electrical in wall being removedDetails
remove non load bearing wall between kitchen & dining room. relocate electrical in wall being removed | $2,000 |