Back to bathroom remodel contractors
Dajani Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2000 to Sep 2026
- Last 24 months
- 19 permits filed
134 permits since 2000: 69 completed, 13 in progress, 28 never finaled, 24 expired or cancelled.
Of the 28 never-finaled permits, 3 are 3 to 5 years old, 15 are 5 to 10 years old, 10 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
8 bathroom remodel permits: 4 completed, 1 in progress, 2 never finaled, 1 expired or cancelled. Typically 46 days from filing to permit and 308 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 13, 2025 | Completed final sign-off Mar 2026 | 2495 03rd St | commerical ti: interior remodel of (e) restaurant space. non bearing partitions, finishes & furnishing + lighting in dining areas. remove (e) bar for smaller service bar. accessibility improvements at bathroom & entry. (e) commercial kitchen to remain, repair finishes. no mechanical workDetails
commerical ti: interior remodel of (e) restaurant space. non bearing partitions, finishes & furnishing + lighting in dining areas. remove (e) bar for smaller service bar. accessibility improvements at bathroom & entry. (e) commercial kitchen to remain, repair finishes. no mechanical work | $297,000 |
| Apr 15, 2025 | In progress issued Apr 2025 | 660 22nd St | relocate tenant demising partition between 2 existing retail spaces. relocate existing tenant bathrooms.Details
relocate tenant demising partition between 2 existing retail spaces. relocate existing tenant bathrooms. | $12,000 |
| Nov 8, 2022 | Completed final sign-off Apr 2024 | 2298 Market St | ti of existing 1 story restaurant. alteration to existing interior spaces of kitchen, bar, dining area. alteration to interior space to add an ada accessible bathroom, level inside and outside eating area for ada accesssiblity. repair e fence at property line.Details
ti of existing 1 story restaurant. alteration to existing interior spaces of kitchen, bar, dining area. alteration to interior space to add an ada accessible bathroom, level inside and outside eating area for ada accesssiblity. repair e fence at property line. | $350,000 |
| Mar 6, 2018 | Never finaled issued May 2018, no final | 381 Hayes St | ref pa 201803062964: mep work only for a new retail store. scope include new vrf system, split system, bathroom exhaust and their associated ductwork.Details
ref pa 201803062964: mep work only for a new retail store. scope include new vrf system, split system, bathroom exhaust and their associated ductwork. | |
| Aug 2, 2016 | Expired or cancelled expired Jul 2023 | 960 Cole St | work on 960 cole st only, voluntary accessibility improvement include demolition of non-compliant bathrooms and entry doors, install (1) unisex accessible restroom and (1) unisex restroom and new entry doors.Details
work on 960 cole st only, voluntary accessibility improvement include demolition of non-compliant bathrooms and entry doors, install (1) unisex accessible restroom and (1) unisex restroom and new entry doors. | $65,000 |
| Mar 26, 2009 | Completed final sign-off Sep 2009 | 84 Turk St | removal of interior non-baering partitions.upgrade front entry ramp and one unisex bathroom. existing place to remain vacant.Details
removal of interior non-baering partitions.upgrade front entry ramp and one unisex bathroom. existing place to remain vacant. | $20,000 |
| Nov 2, 2007 | Completed final sign-off Feb 2009 | 301 King St | convert vacant area to full service restaurant. bar, handicapp bathrooms, pre. area, millwork, hand sink, mop sink, floor sink, lighting, mechanical.Details
convert vacant area to full service restaurant. bar, handicapp bathrooms, pre. area, millwork, hand sink, mop sink, floor sink, lighting, mechanical. | $130,000 |
| Aug 2, 2007 | Never finaled issued Aug 2007, no final | 20 06th St | new grocery, h.c., counter, back shelf. new h.c. bathroom.Details
new grocery, h.c., counter, back shelf. new h.c. bathroom. | $15,000 |