Back to kitchen remodel contractors
Dahe Wang
- Based in
- Oakland
- On San Francisco permits
- Nov 2014 to Jan 2015
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 7 days from filing to permit and 228 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 16, 2015 | Completed final sign-off Sep 2015 | 2766 36th Av | remodel kitchen, two bathrooms & in-fill central patio at 2nd floor. construct two bedrooms, laundry area & one full bathroom at ground floor. contruct new deck w/staircase at rear of bldg (size approx 15'-0" x 4'-0"). relocate interior staircase from 2nd floor down to ground floor.Details
remodel kitchen, two bathrooms & in-fill central patio at 2nd floor. construct two bedrooms, laundry area & one full bathroom at ground floor. contruct new deck w/staircase at rear of bldg (size approx 15'-0" x 4'-0"). relocate interior staircase from 2nd floor down to ground floor. | $72,000 |