D3 Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2005 to Sep 2026
- Last 24 months
- 64 permits filed
475 permits since 2000: 373 completed, 46 in progress, 20 never finaled, 36 expired or cancelled.
Of the 20 never-finaled permits, 6 are 3 to 5 years old, 10 are 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Roof deck permits
15 roof deck permits: 8 completed, 2 in progress, 2 never finaled, 3 expired or cancelled. Typically 52 days from filing to permit and 240 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 15, 2026 | In progress issued May 2026 | 20 Blake St | 3rd floor (top floor) reconfiguration of kitchen & living room, reconfiguration of rear bedroom to master bedroom & adding new master bath (n) electrical and plumbing as required at rear of work only, adding new roof deck.Details
3rd floor (top floor) reconfiguration of kitchen & living room, reconfiguration of rear bedroom to master bedroom & adding new master bath (n) electrical and plumbing as required at rear of work only, adding new roof deck. | $80,000 |
| Jul 2, 2024 | Completed final sign-off Jun 2025 | 4846 17th St | renovation and reconfiguration of the existing kitchen at the 2nd floor, the removal of wall between kitchen and dining area and the replacement and reconfiguration of existing doors at the existing 2nd floor rear roof deck.Details
renovation and reconfiguration of the existing kitchen at the 2nd floor, the removal of wall between kitchen and dining area and the replacement and reconfiguration of existing doors at the existing 2nd floor rear roof deck. | $75,000 |
| Jun 27, 2024 | In progress issued Apr 2025 | 40 Encanto Av | new roof deck, 920 sf addition of new wetbar, new spa, new stair and guardrail interior to roof deckDetails
new roof deck, 920 sf addition of new wetbar, new spa, new stair and guardrail interior to roof deck | $13,750 |
| Oct 5, 2023 | Completed final sign-off May 2024 | 3516 21st St | in kind repair roof deck (less than 50%)Details
in kind repair roof deck (less than 50%) | $9,000 |
| Apr 20, 2021 | Never finaled issued Jun 2021, no final | 4846 17th St | new primary bath at extg 3rd floor primary suite, and remove extg bath at 2nd floor, add new door openings to rear roof deck at 2nd floor.Details
new primary bath at extg 3rd floor primary suite, and remove extg bath at 2nd floor, add new door openings to rear roof deck at 2nd floor. | $30,000 |
| Nov 3, 2020 | Completed final sign-off Apr 2022 | 145 Mountain Spring Av | 3rd flr-reconfig master bath & hall closet to incl a tub, shower & exterior window by tub. add sun-tube/small skylt over tub/shower, bring back roof deck. roof frame replacement in-kind over kitch & din rm. 2nd flr-replace rear windows & drs in bedrm 2,3 & office. nook in bath 2&3.Details
3rd flr-reconfig master bath & hall closet to incl a tub, shower & exterior window by tub. add sun-tube/small skylt over tub/shower, bring back roof deck. roof frame replacement in-kind over kitch & din rm. 2nd flr-replace rear windows & drs in bedrm 2,3 & office. nook in bath 2&3. | $50,000 |
| Sep 20, 2017 | Expired or cancelled expired Mar 2021 | 246 Chenery St | new roof deck & stairs extension to roof.Details
new roof deck & stairs extension to roof. | $20,000 |
| Jun 15, 2017 | Completed final sign-off Mar 2018 | 1935 California St | new roof deck in the rear. replace portion of (e) wood stairs with spiral stairsDetails
new roof deck in the rear. replace portion of (e) wood stairs with spiral stairs | $50,000 |
| Mar 11, 2016 | Completed final sign-off Dec 2016 | 227 Precita Av | at garage level, 1st floor: construct new walls for half toilet & laundry. infill space under (e) bedroom above for new home office,alter(e)stair location w/1-hr wall. at 3rd flr, reconfigure floor space, remodel/replace (e) kitchen and roofdeck over (e)2nd floor.Details
at garage level, 1st floor: construct new walls for half toilet & laundry. infill space under (e) bedroom above for new home office,alter(e)stair location w/1-hr wall. at 3rd flr, reconfigure floor space, remodel/replace (e) kitchen and roofdeck over (e)2nd floor. | $49,000 |
| Aug 24, 2015 | Completed final sign-off Jan 2016 | 3037 California St | interior & minor exterior improvements on attic level: new dormer window, skylights; new interior furred partitions & roof deck for thermal improvements; new lighting, new fixtures.Details
interior & minor exterior improvements on attic level: new dormer window, skylights; new interior furred partitions & roof deck for thermal improvements; new lighting, new fixtures. | $35,000 |
| Apr 2, 2015 | Expired or cancelled expired Mar 2021 | 246 Chenery St | remodel (e) single family dwelling include excavation of crawlspace @ basement. remodel of kitchen, new bath. new 2nd floor addition with roof deck.Details
remodel (e) single family dwelling include excavation of crawlspace @ basement. remodel of kitchen, new bath. new 2nd floor addition with roof deck. | $375,000 |
| Jul 14, 2014 | Completed final sign-off Dec 2015 | 1167 Mission St | change of use on 2nd/3rd floor. new roof deck. ** maher- compliance with ordinance no. 155-13. not required. **Details
change of use on 2nd/3rd floor. new roof deck. ** maher- compliance with ordinance no. 155-13. not required. ** | |
| Jun 2, 2011 | Never finaled issued Jul 2011, no final | 1725 Hyde St | revise roof deck & add handrails to the roof deckDetails
revise roof deck & add handrails to the roof deck | $11,400 |
| Sep 23, 2009 | Expired or cancelled cancelled Jan 2015 | 640 Hayes St | comply w/nov 3200875874 & 20734031 remove roof deck & french doors, open siding for examination of exisitng deck railing & repalce sheetrock on 3rd floor. adding one garage door & one parking stall.Details
comply w/nov 3200875874 & 20734031 remove roof deck & french doors, open siding for examination of exisitng deck railing & repalce sheetrock on 3rd floor. adding one garage door & one parking stall. | $10,000 |
| Sep 9, 2009 | Completed final sign-off Mar 2012 | 1725 Hyde St | add staircase to roof deck. add voluntary structural upgrades to the garage. reconfigure storage area; add one bathroom to unit 1 & unit 2Details
add staircase to roof deck. add voluntary structural upgrades to the garage. reconfigure storage area; add one bathroom to unit 1 & unit 2 | $25,000 |