Back to pergola or trellis contractors
D V Rasmussen & Son Inc.
- Based in
- Novato
- On San Francisco permits
- Nov 2008 to Jun 2026
- Last 24 months
- 2 permits filed
63 permits since 2000: 42 completed, 3 in progress, 6 never finaled, 12 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for pergola or trellis across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Pergola or trellis permits
2 pergola or trellis permits: 2 in progress. Typically 57 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 12, 2026 | In progress filed Feb 2026, not yet issued | 80 San Fernando Wy | new basement excavation & replace (e) foundation walls. rebuild main level sunroom, trellis & chemney in same location (like for like). re-frame & strenhthen roof framing. replace garage door. new exterior windows, doors in (e) locations, new exterior paint. new partitions. interior finishes,Details
new basement excavation & replace (e) foundation walls. rebuild main level sunroom, trellis & chemney in same location (like for like). re-frame & strenhthen roof framing. replace garage door. new exterior windows, doors in (e) locations, new exterior paint. new partitions. interior finishes, | $750,000 |
| Aug 8, 2024 | In progress issued Oct 2024 | 2500 Steiner St | an existing roof patio space is to be renovated to include a shared patio & garden (590 sqft) & a private patio(160 s.f.) at the podium level of a multi-family residential bldg. work at the renovated patios is to include steel trellis structures with wood lattice infill, percelain pavers,Details
an existing roof patio space is to be renovated to include a shared patio & garden (590 sqft) & a private patio(160 s.f.) at the podium level of a multi-family residential bldg. work at the renovated patios is to include steel trellis structures with wood lattice infill, percelain pavers, | $150,000 |