Back to bathroom remodel contractors
D V Rasmussen & Son Inc.
- Based in
- Novato
- On San Francisco permits
- Nov 2008 to Jun 2026
- Last 24 months
- 2 permits filed
63 permits since 2000: 42 completed, 3 in progress, 6 never finaled, 12 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
25 bathroom remodel permits: 21 completed, 1 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 259 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2022 | Completed final sign-off Apr 2024 | 2500 Steiner St | apt #3: renovation of one kitchen and four bathrooms. installation of new floor finishes, interior trim and high efficacy lighting throughout. no structural work or exterior work is included.Details
apt #3: renovation of one kitchen and four bathrooms. installation of new floor finishes, interior trim and high efficacy lighting throughout. no structural work or exterior work is included. | $600,000 |
| Mar 3, 2021 | Completed final sign-off Jan 2022 | 2456 Steiner St | interior remodel of existing kitchen, powder room and two bathrooms in the 1st and 2nd fl units. inclides replacement of cabinets, counters and fixtures. no structural work or exterior changes included. no layout change.Details
interior remodel of existing kitchen, powder room and two bathrooms in the 1st and 2nd fl units. inclides replacement of cabinets, counters and fixtures. no structural work or exterior changes included. no layout change. | $150,000 |
| Dec 24, 2019 | Completed final sign-off Sep 2020 | 1234 05th Av | kitchen and guest bath remodel. kitchen 240 sq ft, guest bath 72 sq ft. replace kitchen cabinets, counter tops and fixtures. new floors in kitchen and pantry. all new finishes, cabinets and fixtures in guest bath. replace (e) bath fan. no change to exteriorDetails
kitchen and guest bath remodel. kitchen 240 sq ft, guest bath 72 sq ft. replace kitchen cabinets, counter tops and fixtures. new floors in kitchen and pantry. all new finishes, cabinets and fixtures in guest bath. replace (e) bath fan. no change to exterior | $50,000 |
| Jun 5, 2019 | Completed final sign-off Aug 2019 | 1318 Page St | renovation of bathroom; replacement of finishes & fixtures & fixtures to be replaced in same location. approx 108 sq.Details
renovation of bathroom; replacement of finishes & fixtures & fixtures to be replaced in same location. approx 108 sq. | $15,000 |
| Sep 19, 2018 | Expired or cancelled expired Feb 2023 | 565 Belvedere St | remodel of both units including kitchens & bathrooms. infill of the tradesman's entrance on 1st flr & construction of a roof deck. replace all windows. legalization of the ground dweling unit under pa#2018-0919-0766.Details
remodel of both units including kitchens & bathrooms. infill of the tradesman's entrance on 1st flr & construction of a roof deck. replace all windows. legalization of the ground dweling unit under pa#2018-0919-0766. | $325,000 |
| Apr 3, 2018 | Completed final sign-off Nov 2018 | 2500 Steiner St | remodel 4 existing bathrooms. replace finished & fixtures. no structural work. no work to envelope. all lights shall be high efficacy w/1 vacancy sensor. building fire alarm systen notification upgrade is requoired per ordiance under separate applicationDetails
remodel 4 existing bathrooms. replace finished & fixtures. no structural work. no work to envelope. all lights shall be high efficacy w/1 vacancy sensor. building fire alarm systen notification upgrade is requoired per ordiance under separate application | $200,000 |
| Feb 6, 2018 | Completed final sign-off May 2019 | 2301 Scott St | interior remodel of 2 bathrooms & 1 kitchen & roof deck replacement of three decks. there will be no changes to the building envelopeDetails
interior remodel of 2 bathrooms & 1 kitchen & roof deck replacement of three decks. there will be no changes to the building envelope | $50,000 |
| Nov 2, 2017 | Expired or cancelled cancelled Sep 2019 | 2301 Scott St | unit #2 - bathroom and bedroom remodel including finisher & fixtures. unit #4 - bathroom and kitchen remodel including finisher & fixtures. high efficiency lighting and vacancy sensors to be used. no structural or exterior work.Details
unit #2 - bathroom and bedroom remodel including finisher & fixtures. unit #4 - bathroom and kitchen remodel including finisher & fixtures. high efficiency lighting and vacancy sensors to be used. no structural or exterior work. | $100,000 |
| Dec 14, 2015 | Completed final sign-off Apr 2016 | 2259 Clay St | remodel one bathroom - replace fixtures and finishes, no change in wall and opening layout. any changes in lighting would be high efficacy or controlled by manual on sensor with high efficacy main light.Details
remodel one bathroom - replace fixtures and finishes, no change in wall and opening layout. any changes in lighting would be high efficacy or controlled by manual on sensor with high efficacy main light. | $60,000 |
| May 27, 2015 | Completed final sign-off Apr 2016 | 2250 Green St | #7 - addition work to pa#201504032803 to include move one door, move (e) window & replace with double glazed wood window, replace another (e) window with double glazing, all work in lightwell. kitchen to be relocated, enlarge two bathrooms. n/a ordinance #155-16Details
#7 - addition work to pa#201504032803 to include move one door, move (e) window & replace with double glazed wood window, replace another (e) window with double glazing, all work in lightwell. kitchen to be relocated, enlarge two bathrooms. n/a ordinance #155-16 | $2,000 |
| Apr 3, 2015 | Completed final sign-off Apr 2016 | 2250 Green St | apt #7: no exterior or structural work. interior kitchen & bathrooms remodeled, including fixtures & finishes. 2 bathrooms. hardwood floors refinished & painting throughout. 50% of lights in kitchen are high efficency & at least 1 light in bathroom are vacancy sensors.Details
apt #7: no exterior or structural work. interior kitchen & bathrooms remodeled, including fixtures & finishes. 2 bathrooms. hardwood floors refinished & painting throughout. 50% of lights in kitchen are high efficency & at least 1 light in bathroom are vacancy sensors. | $150,000 |
| Oct 2, 2014 | Completed final sign-off Sep 2016 | 2422 Clay St | the remodel includes work on all three (e) floors. on the 1st floor the (e) crawlspace will be excavated to create habitable space including a bedroom, bathroom, family room with wet bar & laundry room. n/a maher ordinanceDetails
the remodel includes work on all three (e) floors. on the 1st floor the (e) crawlspace will be excavated to create habitable space including a bedroom, bathroom, family room with wet bar & laundry room. n/a maher ordinance | $750,000 |
| Dec 3, 2013 | Never finaled issued Dec 2013, no final | 338 Spear St | unit 41b. renovate living room, powder room, kitchen, master bedroom & bath, new flooring, new lighting, no structural or exterior work is included.Details
unit 41b. renovate living room, powder room, kitchen, master bedroom & bath, new flooring, new lighting, no structural or exterior work is included. | $300,000 |
| Nov 22, 2013 | Completed final sign-off Jun 2015 | 2301 Scott St | no exterior or structural work, interior kitchen & bath remodel including replacement of fixtures & finishes, occupancy sensors or high effeciency lighting to be used, no change on walls. work in unit # 6Details
no exterior or structural work, interior kitchen & bath remodel including replacement of fixtures & finishes, occupancy sensors or high effeciency lighting to be used, no change on walls. work in unit # 6 | $25,000 |
| Dec 28, 2012 | Expired or cancelled expired Aug 2017 | 1244 31st Av | lower existing floor slab on garage level, add 220 s.f tower remodel kitchen & bathrooms unify mixed character neighborhood, rebuild front stair.Details
lower existing floor slab on garage level, add 220 s.f tower remodel kitchen & bathrooms unify mixed character neighborhood, rebuild front stair. | $100,000 |
| Oct 3, 2012 | Completed final sign-off Nov 2013 | 2500 Steiner St | renovation of 4 bathrooms and the kitchen, installation of new wood flooring, interior trim changes, addition of lighting painting throughout, no structural work or exterior work is included, cec 150(k) for permanently installed lighting (n) bath fans and kitchen hood to tie back to (e) ductingDetails
renovation of 4 bathrooms and the kitchen, installation of new wood flooring, interior trim changes, addition of lighting painting throughout, no structural work or exterior work is included, cec 150(k) for permanently installed lighting (n) bath fans and kitchen hood to tie back to (e) ducting | $300,000 |
| May 3, 2012 | Completed final sign-off Sep 2013 | 1940 Broadway | interior remodel, no exterior or structural changes, interior kitchen: replace existing with new plumbing fixtures, appliances & cabinetry. 3 bathrooms: replace existing with new plumbing fixtures & finishes, replace flooring throughout, approx. 2000 sq.ft.Details
interior remodel, no exterior or structural changes, interior kitchen: replace existing with new plumbing fixtures, appliances & cabinetry. 3 bathrooms: replace existing with new plumbing fixtures & finishes, replace flooring throughout, approx. 2000 sq.ft. | $250,000 |
| Apr 12, 2012 | Completed final sign-off Dec 2012 | 2301 Scott St | no exterior or structural work, interior kitchen & bath remodel including replacement of fixtures and finishes, lighting in bathroom & kitchen shall comply with cec150(k)8,10. (e) bathroom exhaust fan- verify in field.Details
no exterior or structural work, interior kitchen & bath remodel including replacement of fixtures and finishes, lighting in bathroom & kitchen shall comply with cec150(k)8,10. (e) bathroom exhaust fan- verify in field. | $25,000 |
| Sep 22, 2011 | Completed final sign-off Nov 2011 | 2301 Scott St | #1 - one bathroom remodel, new fixtures & tile, no exterior or structural work. high efficacy lighting or occupancy sensor, no change to exhaust system.Details
#1 - one bathroom remodel, new fixtures & tile, no exterior or structural work. high efficacy lighting or occupancy sensor, no change to exhaust system. | $15,000 |
| Oct 13, 2010 | Completed final sign-off Apr 2013 | 158 Jordan Av | basement: new guest suite, playroom, wire cellar, mechanical & storage rooms. main level:rear addition & remodel include kitchen & family room, enclose entry, new deck at rear yard.2nd level: remodel bathrooms & bedrooms. 1 new sklight on roof.Details
basement: new guest suite, playroom, wire cellar, mechanical & storage rooms. main level:rear addition & remodel include kitchen & family room, enclose entry, new deck at rear yard.2nd level: remodel bathrooms & bedrooms. 1 new sklight on roof. | $500,000 |
| Jul 22, 2010 | Completed final sign-off Jan 2011 | 3525 Clay St | additional work to 201007227251,interior renovation to 3rd fl: remodel master bath, relocate guest bath and study, new laundry and 2nd fl butler pantry. wall configuration changes.Details
additional work to 201007227251,interior renovation to 3rd fl: remodel master bath, relocate guest bath and study, new laundry and 2nd fl butler pantry. wall configuration changes. | $45,000 |
| Jun 11, 2010 | Completed final sign-off Mar 2012 | 2113 Bush St | (n) interior stair between 1st & 2nd fl, replace (e) kitchen. merging (e) 2 units building into single family dwelling. (n) bedroom, bathroom and office at basement level with retaining walls and stairs to rear year. horizontal extenstion of 18 feet under (e) rear deck. remodel of bed & bath @3rd flDetails
(n) interior stair between 1st & 2nd fl, replace (e) kitchen. merging (e) 2 units building into single family dwelling. (n) bedroom, bathroom and office at basement level with retaining walls and stairs to rear year. horizontal extenstion of 18 feet under (e) rear deck. remodel of bed & bath @3rd fl | $20,000 |
| May 28, 2010 | Completed final sign-off Jan 2011 | 3525 Clay St | interior remodel, no exterior or structural changes. remodel of (e) master bathroom, dressing room, laundry room & kitchen pantry, no structural work. provide high efficacy lighting &/or required switches per cec 150(k)Details
interior remodel, no exterior or structural changes. remodel of (e) master bathroom, dressing room, laundry room & kitchen pantry, no structural work. provide high efficacy lighting &/or required switches per cec 150(k) | $150,000 |
| Mar 10, 2010 | Completed final sign-off Dec 2010 | 2500 Steiner St | interior remodel. no exterior or structural changes. work on the 8th floor. replace kitchen counters and appliances. install new fixtures, tile and cabinets in five bathrooms. install new trim and hardware. refinish existing floors. lighting to comply with cec 150(k). no change to exhaustDetails
interior remodel. no exterior or structural changes. work on the 8th floor. replace kitchen counters and appliances. install new fixtures, tile and cabinets in five bathrooms. install new trim and hardware. refinish existing floors. lighting to comply with cec 150(k). no change to exhaust | $300,000 |
| Nov 13, 2008 | Completed final sign-off Feb 2009 | 2500 Steiner St | remodel of guest bath, including new shower relocated sink, and added recessed fixture. remodel of art room including installation of utility sink, ice maker, freezer and wine chiller.Details
remodel of guest bath, including new shower relocated sink, and added recessed fixture. remodel of art room including installation of utility sink, ice maker, freezer and wine chiller. | $12,000 |