Back to kitchen remodel contractors
D Squared Construction
- Based in
- Concord
- On San Francisco permits
- Jun 2014 to Apr 2026
- Last 24 months
- 3 permits filed
29 permits since 2000: 19 completed, 2 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 never finaled. Typically 4 days from filing to permit and 405 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 3, 2018 | Never finaled issued May 2018, no final | 1130 Sacramento St | main water line needs to be replaced, kitchen remodeled due to the water damage in kind and some drywall replaced.Details
main water line needs to be replaced, kitchen remodeled due to the water damage in kind and some drywall replaced. | $15,000 |
| May 12, 2015 | Completed final sign-off Jun 2016 | 1250 42nd Av | remove and construct new kitchen in front room. remove load bearing walls and install new beams. add new half bath and new master bath. add new dumb waiter. add new furnace, ductwork, and on demand hot water heater. replace all windows. add new landing and stairs at rear.Details
remove and construct new kitchen in front room. remove load bearing walls and install new beams. add new half bath and new master bath. add new dumb waiter. add new furnace, ductwork, and on demand hot water heater. replace all windows. add new landing and stairs at rear. | $80,000 |