Back to kitchen remodel contractors
D R Design Construction
- Based in
- San Leandro
- On San Francisco permits
- Jun 2015 to Jun 2015
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 never finaled. Typically 1 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2015 | Never finaled issued Jun 2015, no final | 10 Nobles Al | kitchen & bath remodel: remove plaster and install insulation. remove elec. remove kitchen and bathroom. remove plumbing. install new elec. plumbing and drywall. installnew kitchen cabinets and bathroom fixtures.Details
kitchen & bath remodel: remove plaster and install insulation. remove elec. remove kitchen and bathroom. remove plumbing. install new elec. plumbing and drywall. installnew kitchen cabinets and bathroom fixtures. | $15,000 |