Back to kitchen remodel contractors
D Lopez Jr Concrete Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2008 to Nov 2016
- Last 24 months
- 0 permits filed
6 permits since 2000: 4 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 23 days from filing to permit and 552 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2015 | Completed final sign-off Feb 2017 | 1559 Willard St | upper flr int. remodel including add 2 new bedrooms & 1 bath, door replacement & window removal, door installation @ rear. 951 s.f. of (e) 1st floor to become habitable including move kitchen, living to lower level. add 1/2 bath + mech rm, foundation. replacement (n) shear walls. footprint unchangeDetails
upper flr int. remodel including add 2 new bedrooms & 1 bath, door replacement & window removal, door installation @ rear. 951 s.f. of (e) 1st floor to become habitable including move kitchen, living to lower level. add 1/2 bath + mech rm, foundation. replacement (n) shear walls. footprint unchange | $550,000 |